My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-28-1998 PTRC Minutes
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes/Packets/(1968 to 2009)
>
1990-1998
>
1998
>
07-28-1998 PTRC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:16:01 AM
Creation date
7/12/2022 2:21:38 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 5.2. Planned Trail Connections <br /> . w�Segiiierit`jr = ' <br /> 1 New Brighton Road <br /> a. Co. Rd. E2 to Co. Rd. E A 9 <br /> b. Co. Rd. E to Stowe A 2 <br /> c. Stowe to Co. Rd. D A .5 <br /> 2 Pedestrian crossing - Highway #51 and County Road E, on q <br /> existing bridge. <br /> 3 Co. Rd. F from Lexington to Hamline?.venue; north on q 7 <br /> Hamline to existing trail. <br /> 4 Parkshore Drive west of Snelling Ave-nue to Blueberry Lane; <br /> around the west side os RoLmd Lake. <br /> a. Gateway Business Park to Highway#96 q 8 <br /> b. Park Shore Drive to Gateway Business Park A .4 <br /> 5 Old Highway #10, from the southern City border north to <br /> Highway #96. <br /> a. Hwy #96 to Park Shore Drive B 8 <br /> b. Park Shore Drive to Co. Rd. E B 1.4 <br /> c. Co. Rd. E to Co. Rc D B 1 1 <br /> 6 Lake Johanna Boulevard wrest to Tor-, Schmidt Park g 4 <br /> 7 Lake Valentine Road - Snelling west to Mounds View High g 5 <br /> School. <br /> 8 North Snelling Avenue, f —m Royal fizp-s Park to Highway#96 g 5 <br /> 9 Lake Johanna Boulevard, south from ?ark to Co. Rd. D C 8 <br /> Co <br /> 10 the south side of Lake Johanna, around Northwestern C <br /> College. 1.1 <br /> 11 Ingerson Road Trail <br /> a. Lexington to Hamline b. Ha C 5 <br /> mline south to border C .4 <br /> 12 Bethel College - around the east side of Valentine Lake C <br /> 13 Pedestrian bridge - Highway #10 Royal Hills Park to Round C 1 1 <br /> Lake area •2 <br /> 14 Rail spur in Gateavay BuC;,ess Park C 5 <br /> 15 Three (3) underpasses - v den with `treet reconstruction C <br /> 16 TCAAP rail fine from Mounds View C <br /> Trail easements in a_ea identired ^gay be acquired when land is developed. In <br /> developed areas, traii easements or land can be acquired as redevelopment <br /> occurs or as opporti+.^ities arise, abandoned railroad right-of-way or in utility <br /> rights-of-rya}'. <br /> No new neighborhood parks are planned outside of the TCAAP area. Within the <br /> 40 TCAAP area, parks and trails will be constructed as development occurs. <br /> Page 7 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.