Laserfiche WebLink
J <br /> some seeding and sodding along some of the edges, and cleaning up a silt fence at a <br /> residents house along Briarknoll. There are also a few costs remaining to be paid for the <br /> Perry Park Playstructure. After all the payments have been received for the trail and the <br /> playstructre, Ms. Walsh estimated the fund balance to be approximately $450,000. This <br /> does not include the budgeted 1997 projects. <br /> 1997 PARK FUND PROJECTS AND BUDGET <br /> Mrs. Walsh provided the Committee with the 1997 Park Fund Project Budget. The <br /> Committee had a brief discussion. The following is a list of the 1997 Park Fund Projects <br /> budgeted for 1997: <br /> Gateway Flower Garden Projects $ 3200.00 <br /> Hazelnut Playstructure $30,000.00 <br /> Trails $42,665.00 <br /> Revenue <br /> Grants $50,191.50 <br /> Interest $25,750.00 <br /> Contributions $12,000.00 <br /> Park dedications $10,000.00 <br /> MISCELLANEOUS <br /> • The Committee discussed the Gateway <br /> e ay Flower Gardens for 1997 and it was the consensus <br /> of the Committee to leave the flower gardens the way they are for 1997. The Committee <br /> decided to wait and see what the County does with Highway 96 and what is done with the <br /> townhomes on County Road E2. In 1996 the Gateway Flower Garden will cost about <br /> $1,600 about half of what was budgeted for them. <br /> DEPARTMENT REPORTS <br /> Program Report <br /> Ms. Petersen stated that the ice rinks will be opening on December 23, 1996. The rinks <br /> are in good condition. The Breakfast with Santa was held on Saturday, December 14th <br /> and there was a good turnout. There were about 45-46 kids and adults that attended. <br /> Directors Report <br /> Ms. Walsh stated that she had done some estimates on installing a drinking fountain at <br /> Cummings Park. There is not a close water source to put a pipe under the cul-de-sac. <br /> The cost estimate for the piping is $10,000. <br /> The plumber would not advise placing a drinking fountain anywhere out of site, due to <br /> vandalism that would occur. The cost of a drinking fountain at Perry outside the building <br /> • would be about $600-$800. <br /> 3 <br />