Laserfiche WebLink
• ARDEN HILLS PARKS DEPARTMENT <br /> PEDESTRIAN TRAILS <br /> Proposed Blacktopping Schedule <br /> The trails were divided into four categories : 0 ) section recommended for <br /> blacktopping in 1987 because of high usage and difficult terrain; (2) , <br /> (3), and (4) suggested priority for blacktopping in the future as funds <br /> are available <br /> Length Surface <br /> Arden Trail <br /> Glenpaul to Stowe 2 575 , <br /> Stowe to Co Rd E Ag Lime ? <br /> 1, 500 ' Grass 2 <br /> Chatham Trails <br /> Connection 1 , 200 ' <br /> 160 ' hard 4 <br /> surface, 1, 040 <br /> Corridors grass, blocks <br /> (600 ' leading to Valentine Sc)iool) <br /> Natural Area Pathways ' <br /> 8, 400 ' Grass <br /> To,.,n House Trails <br /> • !pillage Hall Trail _ ?00 ^ <br /> igSP Trail Grass <br /> -1 <br /> Corridor 1 , 300 ' Grass <br /> ;0 Grass <br /> Floral to Norma Corridor 600 , <br /> Ag Llr:;e _ <br /> Cummings Parr: to Floral Trail <br /> Cummings Park Trail 1 ,500 ' <br /> Cummings to Floral Grass 3 <br /> Floral 2, 050 ' Grass ? <br /> 2,000' Grass 3 <br /> Cr.-epeau Nature Preserve <br /> Nature Trails 2, 800 ' <br /> Grass <br /> BREAKD0�-1N BY RUNNIAiG FOOT <br /> Phase 1 620 feet <br /> Phase 2 6, 125 feet <br /> Phase 3 15, 540 feet <br /> Phase 4 4, 580 feet <br /> • <br />