My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8-25-1992 PTRC Meeting Minutes
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes/Packets/(1968 to 2009)
>
1990-1998
>
1992
>
8-25-1992 PTRC Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 11:36:56 AM
Creation date
7/15/2022 9:37:48 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
remaining 9.7 miles by fall. <br />Already, the trail is serving many dif%rent outdoor enthusiasts--bicylists, walkers, joggers, in-line <br />skaters, and horseback riders. The 9.7 mile stretch from I-694 to the trail's eastern end will include <br />a tread way for horseback riders parallel to the asphalt surface. Bridges span McKnight Road and <br />White Bear Avenue so that trail users can safely and easily cross these two busy roads. The <br />approaches to the bridges are at a 5 percent grade making it easy for bicyclists, but also ensuring <br />access for people with limited mobiliry, such as those in wheelchairs. <br />As you bike the Gateway, your tires rolls on tires. As paR of a project to demonstrate a use for junk <br />Rolling on Rubber tires—a huge and expensive disposal problem—the DNR, Department of Transportation and <br />Pollution Control Agency had long segments of trail paved with a mixture of asphalt, pulverized old <br />tires, and waste shingles. The tires were ground to bits the size of graveL This "rubber gravel" was <br />added to normal bituminous mixture in place of real gravel. the bituminous mixture was laid on the <br />trail, rolled, and compacted. Trail users may notice a grainier te�cture and darker color than that of <br />normal asphalt surfaces. The DNR and DOT are evaluating the ef�ectiveness of the experiment. <br />Before you hit the trail, pick up a trail map from the DNR Information Center. Ask the DNR <br />assistants is any sections are closed for construction. You won't find many trail-side facilities, so <br />remember to bring water and snacks if you plan to be out long. Wliether you're walking or riding, <br />you'll see the city with new eyes. <br />* * * �k <br />Reprinted with perntission from the DNRMinnesota Volunteer, July-Aug. 1992, pp.38-43. by Laurie Young, <br />trail planning supervisor for the DNR Trails and Waterways Unit in St. Paul <br />Editor's note: At this time paving ofthe final nine mile segment between I-694 and Pine Point Park is now <br />almost completed. Usage by cyclists, in-line skaters, and walkers isalready high.The DNR recently received <br />a LCMR gant to study the feasibility of extending the Gateway trail southward from its western end (at 35E <br />and Arlington) to the Capitol azea of downtown St. Paul. Public support for this project is mounting rapidly. <br />Gateway <br />M.P �A�s <br />0 1 2 3 Miles <br />I I I I <br />� <br />Hnppy Trails is a regular insert provided for Park Notes. For articles or comments please contact Bill Frank, 438 Iona Lane, <br />Roscville, MN 55113, phone (612) 484-5068. <br />
The URL can be used to link to this page
Your browser does not support the video tag.