My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-25-22-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
07-25-22-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2022 3:35:55 PM
Creation date
7/21/2022 3:30:55 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
930930930930 <br />930928928929931931931931931931932932932932932932933933933934933933930931931931931931931932932932932932932932932932932933933930929931932This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.SHEET NUMBER 2022 KIMLEY-HORN AND ASSOCIATES, INC.767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114PHONE: 651-645-4197WWW.KIMLEY-HORN.COMK:\TWC_LDEV\LAUNCH PROPERTIES\ARDEN HILLS\3 Design\CAD\PlanSheets\C2-DEMO PLAN.dwg June 01, 2022 - 5:22pmBYREVISIONSNo.DATEPRELIMINARY - NOT FOR CONSTRUCTIONPREPARED FORDEMO PLANC100LAUNCH RETAIL -ARDEN HILLSLAUNCHPROPERTIESARDEN HILLSMN1. THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION, REMOVAL, AND DISPOSAL (IN A LOCATIONAPPROVED BY ALL GOVERNING AUTHORITIES) ALL STRUCTURES, PADS, WALLS, FLUMES, FOUNDATIONS,PARKING, DRIVES, DRAINAGE STRUCTURES, UTILITIES, ETC. SUCH THAT THE IMPROVEMENTS ON THE PLANSCAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLE MATERIAL ANDBROUGHT TO GRADE WITH SUITABLE COMPACTED FILL MATERIAL PER THE PROJECT DOCUMENTS.2. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS FROM THE SITE AND DISPOSING THE DEBRISIN A LAWFUL MANNER. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FORDEMOLITION AND DISPOSAL. CONTRACTOR SHALL PROVIDE COPIES OF THE PERMIT AND RECEIPTS OFDISPOSAL OF MATERIALS TO THE OWNER AND OWNERS REPRESENTATIVE.3. THE CONTRACTOR SHALL MAINTAIN ALL UTILITY SERVICES TO ADJACENT PROPERTIES AT ALL TIMES. UTILITYSERVICES SHALL NOT BE INTERRUPTED WITHOUT APPROVAL FROM THE CONSTRUCTION MANAGER ANDCOORDINATION WITH THE ADJACENT PROPERTIES AND/OR THE CITY.4. THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE REMOVALAND/OR RELOCATION OF UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANYCONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITY COMPANY'S FORCES ANDANY FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR SERVICES. THE CONTRACTOR ISRESPONSIBLE FOR PAYING ALL FEES AND CHARGES.5. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN ON THE PLAN HAVE BEEN DETERMINED FROM THE BESTINFORMATION AVAILABLE AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEERASSUMES NO RESPONSIBILITY FOR THEIR ACCURACY. PRIOR TO THE START OF ANY DEMOLITION ACTIVITY,THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES FOR LOCATIONS OF EXISTING UTILITIES WITHINALL AREAS OF PROPOSED WORK.6. ALL EXISTING SEWERS, PIPING AND UTILITIES SHOWN ARE NOT TO BE INTERPRETED AS THE EXACTLOCATION, OR AS ANY OBSTACLES THAT MAY OCCUR ON THE SITE. VERIFY EXISTING CONDITIONS ANDPROCEED WITH CAUTION AROUND ANY ANTICIPATED FEATURES. GIVE NOTICE TO ALL UTILITY COMPANIESREGARDING DESTRUCTION AND REMOVAL OF ALL SERVICE LINES AND CAP ALL LINES BEFORE PRECEDINGWITH THE WORK.7. ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC, AND/OR GAS LINES NEEDING TO BE REMOVED ORRELOCATED SHALL BE COORDINATED WITH THE AFFECTED UTILITY COMPANY. ADEQUATE TIME SHALL BEPROVIDED FOR RELOCATION AND CLOSE COORDINATION WITH THE UTILITY COMPANY IS NECESSARY TOPROVIDE A SMOOTH TRANSITION IN UTILITY SERVICE. CONTRACTOR SHALL PAY CLOSE ATTENTION TOEXISTING UTILITIES WITHIN ANY ROAD RIGHT-OF-WAY DURING CONSTRUCTION.8. CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES, ENCLOSURES, ETC.(AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES) AS APPROVED BY THE CONSTRUCTIONMANAGER. MAINTENANCE OF TRAFFIC CONTROL SHALL BE COORDINATED IN ACCORDANCE WITH ARDENHILLS, <COUNTY> COUNTY AND MN/DOT.9. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL ADJACENT PROPERTIES DURING CONSTRUCTION, ANDSHALL NOTIFY ALL PROPERTIES IF ACCESS WILL BE INTERRUPTED OR ALTERED AT ANY TIME DURINGCONSTRUCTION.10. PRIOR TO DEMOLITION OCCURRING, ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED.11. CONTRACTOR MAY LIMIT SAW-CUT AND PAVEMENT REMOVAL TO ONLY THOSE AREAS WHERE IT ISREQUIRED AS SHOWN ON THESE CONSTRUCTION PLANS BUT IF ANY DAMAGE IS INCURRED ON ANY OF THESURROUNDING PAVEMENT, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ITS REMOVAL AND REPAIR.12. THE CONTRACTOR SHALL COORDINATE WATER MAIN WORK WITH THE FIRE DEPT. AND THE CITY WATERDEPARTMENT TO PLAN PROPOSED IMPROVEMENTS AND TO ENSURE ADEQUATE FIRE PROTECTION ISCONSTANTLY AVAILABLE TO THE SITE THROUGHOUT THIS SPECIFIC WORK AND THROUGH ALL PHASES OFCONSTRUCTION. CONTRACTOR WILL BE RESPONSIBLE FOR ARRANGING/PROVIDING ANY REQUIRED WATERMAIN SHUT OFFS WITH THE CITY OF ARDEN HILLS DURING CONSTRUCTION. ANY COSTS ASSOCIATED WITHWATER MAIN SHUT OFFS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AND NO EXTRACOMPENSATION WILL BE PROVIDED.13. REFER TO SURVEY FOR ALL EXISTING INVERT AND RIM ELEVATIONS.14. ALL UTILITIES SHOWN ARE EXISTING UTILITIES.15. IN THE EVENT A WELL IS FOUND, THE CONTRACTOR SHALL CONTACT THE ENGINEER AND OWNERIMMEDIATELY. ALL WELLS SHALL BE SEALED BY A LICENSED WELL CONTRACTOR IN ACCORDANCE WITH ALLSTATE OF MN REQUIREMENTS.16. IN THE EVENT THAT UNKNOWN CONTAINERS OR TANKS ARE ENCOUNTERED, THE CONTRACTOR SHALLCONTACT THE OWNER AND/OR OWNERS REPRESENTATIVE IMMEDIATELY. ALL CONTAINERS SHALL BEDISPOSED OF AT A PERMITTED LANDFILL PER THE PROJECT DOCUMENTS.17. CONTRACTOR SHALL NOTIFY THE ENGINEER IF ANY EXISTING DRAINTILE IS ENCOUNTERED ON SITE. NOACTIVE DRAINTILE SHALL BE REMOVED WITHOUT APPROVAL FROM THE ENGINEER.DEMOLITION PLAN NOTESNORTHLIMITS OF CONSTRUCTIONREMOVE BITUMINOUS SURFACEREMOVE CONCRETE SURFACEREMOVE BUILDINGREMOVE TREEREMOVE CONCRETE CURB & GUTTERREMOVE UTILITY LINESPROPERTY LINEEXISTING OVERHEAD POWER LINEEXISTING CHAINLINK FENCEEXISTING J-BARRIEREXISTING RETAINING WALLEXISTING SANITARY SEWEREXISTING STORM SEWEREXISTING WATERMAINEXISTING GAS MAINEXISTING UNDERGROUND TELEPHONEEXISTING UNDERGROUND CABLEEXISTING CONTOUREXISTING SIGNEXISTING FLARED END SECTIONEXISTING STORM MANHOLEEXISTING STORM CATCHBASINEXISTING GAS METEREXISTING POST INDICATOR VALVEEXISTING WELLEXISTING AUTOMATIC SPRINKLEREXISTING ROOF DRAINEXISTING GATE VALVEEXISTING HYDRANTEXISTING METAL COVEREXISTING ELECTRICAL METEREXISTING AIR CONDITIONEREXISTING TELEPHONE MANHOLEEXISTING CABLE BOXEXISTING GUY WIREEXISTING POWER POLEEXISTING LIGHT POLEEXISTING TREECLEARING & GRUBBINGFILL & ABANDON UTILITY LINESEXISTING TREE LINEEXISTING CURB & GUTTERLEGENDFULL DEPTH SAWCUTLIMITS OF DISTURBANCE(OFFSET FOR CLARITY)REMOVE EXISTING SANITARYREMOVE CONNECTION TO BUILDINGAND POWER POLECOORDINATE WITH ELETRICAL COMPANYREMOVE EXISTING ASPHALTREMOVE EXISTING ASPHALTREMOVE EXISTING ASPHALTREMOVE EXISTING CURBREMOVE EXISTING CONCRETEREMOVE EXISTING CURBREMOVE EXISTING CONCRETEREMOVE EXISTING CONCRETEREMOVE EXISTING CONCRETEREMOVE EXISTING CONCRETEREMOVE EXISTING BUILDINGREMOVE EXISTING ASPHALTPROTECT EXISTING ASPHALTPROTECT EXISTING UTILITIESREMOVE EXISTING TREE(TYP.)REMOVE EXISTING TREE(TYP.)REMOVE EXISTING TREE(TYP.)REMOVE EXISTING TREE(TYP.)REMOVE ASPHALT FOR WATER CONNECTIONREMOVE ASPHALT FOR STORM SEWER CONNECTIONREMOVE CONNECTION TO BUILDINGCOORDINATE WITH ELETRICAL COMPANYREMOVE EXISTING WOOD FENCEREMOVE EXISTING WOOD FENCEREMOVE EXISTING WOOD FENCE
The URL can be used to link to this page
Your browser does not support the video tag.