My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-25-22-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
07-25-22-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2022 3:35:55 PM
Creation date
7/21/2022 3:30:55 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 Grey Fox Road Redevelopment – Arden Hills <br />Traffic Impact Analysis │ June 2022 <br /> <br />Table 6 – Design Year (2040) Build Intersection Analysis <br />Intersection Control Approach <br />Operations by Movement Overall Intersection Left Through Right <br />Delay <br />(sec/veh) LOS Delay <br />(sec/veh) LOS Delay <br />(sec/veh) LOS Delay <br />(sec/veh) LOS <br />AM Peak Hour <br />Lexington Avenue <br />& Grey Fox Road Signal <br />EB 39.2 D 21.6 C 6.1 A <br />9.4 A WB 37.7 D 36.5 D 5.4 A <br />NB 9.2 A 5.4 A 1.0 A <br />SB 7.6 A 6.5 A 1.5 A <br />Grey Fox Road & <br />Site Access 1 (East) <br />Side <br />Street <br />Stop <br />EB 2.0 A 0.4 A 0.0 A <br />5.8 A WB 2.0 A 1.1 A 0.6 A <br />NB 4.1 A - - 3.8 A <br />SB 5.8 A - - 3.4 A <br />Grey Fox Road & <br />Site Access 2 <br />(West) <br />Side <br />Street <br />Stop <br />EB 1.8 A 0.4 A - - <br />2.7 A WB - - 0.3 A - - <br />NB - - - - - - <br />SB - - - - 2.7 A <br />PM Peak Hour <br />Lexington Avenue <br />& Grey Fox Road Signal <br />EB 33.3 C 26.1 C 10.6 B <br />14.5 B WB 29.3 C 21.0 C 7.6 A <br />NB 19.3 B 12.3 B 2.1 A <br />SB 17.2 B 13.8 B 2.7 A <br />Grey Fox Road & <br />Site Access 1 (East) <br />Side <br />Street <br />Stop <br />EB 1.4 A 2.2 A 0.3 A <br />13.8 B WB 2.2 A 1.2 A 0.7 A <br />NB 7.2 A 8.4 A 11.7 B <br />SB 13.8 B - - 7.7 A <br />Grey Fox Road & <br />Site Access 2 <br />(West) <br />Side <br />Street <br />Stop <br />EB 3.0 A 0.7 A - - <br />3.0 A WB - - 0.5 A - - <br />NB - - - - - - <br />SB - - - - 2.5 A <br />Based on the Design Year (2040) Build capacity analysis, the study intersections are anticipated to operate <br />at LOS B or better in the AM and PM peak hours. The SimTraffic reports are provided in Appendix D . All <br />95th percentile queues are anticipated to remain within their respective storage bays. The eastbound <br />approach at Lexington Avenue & Grey Fox Road should be monitored, going forward. SimTraffic is reporting <br />a 95th percentile queue of approximately 225 feet, which has the potential to impact operations at site <br />access 1, however SimTraffic Shows minimal delay at the access.
The URL can be used to link to this page
Your browser does not support the video tag.