Laserfiche WebLink
Page 2 of 2 <br /> <br />Budget Impact <br /> <br />This project will be covered by the sanitary sewer fund, the total project cost is $116,200 which <br />includes an estimated $2,200 in freight costs as shown in Attachment A, which is above the <br />budgeted amount of $90,000. Prices for materials have increased significantly since the project <br />was originally budgeted. Staff recommends approval of the quote from Electric Pump to replace <br />the control panel in the amount of $116,200. <br /> <br />Only one quote was obtained for this work. The City utilizes Electric Pump for all of its lift <br />stations for consistency in materials and parts. This makes repair time more efficient if there is <br />ever a failure. Timeliness of repairs is necessary for lift stations as it could cause a lot of damage <br />to connected properties if the system backs up. <br /> <br />Attachments <br /> <br />Attachment A: Quote for Replacement of Control Panel and Pump <br />