My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-25-22-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
07-25-22-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2022 3:35:55 PM
Creation date
7/21/2022 3:30:55 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br />Budget Impact <br /> <br />This project will be covered by the sanitary sewer fund, the total project cost is $116,200 which <br />includes an estimated $2,200 in freight costs as shown in Attachment A, which is above the <br />budgeted amount of $90,000. Prices for materials have increased significantly since the project <br />was originally budgeted. Staff recommends approval of the quote from Electric Pump to replace <br />the control panel in the amount of $116,200. <br /> <br />Only one quote was obtained for this work. The City utilizes Electric Pump for all of its lift <br />stations for consistency in materials and parts. This makes repair time more efficient if there is <br />ever a failure. Timeliness of repairs is necessary for lift stations as it could cause a lot of damage <br />to connected properties if the system backs up. <br /> <br />Attachments <br /> <br />Attachment A: Quote for Replacement of Control Panel and Pump <br />
The URL can be used to link to this page
Your browser does not support the video tag.