Laserfiche WebLink
Date:July 21, 2022 <br />We DIG integrity, quality and teamwork on every project <br />190 Ryan Lane, Little Canada, MN 55117 <br />Phone 651-484-8766 Fax 651-482-0285 <br />Project Name <br />Work description <br />Item Quantity Cost TOTAL <br />Material <br />Foreman w/ Utility Truck 8.0 hours 115$ 920 <br />Foreman OT 5.0 hours 151$ 755 <br />John Deere Excavator 10.0 hours 245$ 2,450 <br />Bobcat Skid Loader 10.0 hours 175$ 1,750 <br />Bomag Compactor 1.0 rental 831$ 831 <br />Dump Truck 28.0 hours 145$ 4,060 <br />John Deere Loader 10.0 hours 175$ 1,750 <br />Vactor Truck 1.0 day 3,331$ 3,331 <br />12" 45 Degree Bend 1.0 unit 626$ 626 <br />12" DIP sleeve 1.0 unit 577$ 577 <br />12" DIP Pipe 20.0 feet 92$ 1,844 <br />12" Megalug and Accessories 1.0 unit 515$ 515 <br />Select Sand 160.0 tons 15$ 2,400 <br />CA 67 Stone 39.0 tons 47$ 1,842 <br />Class 7 Recycle 63 tons 14$ 882 <br />Millings 56 tons 14$ 784 <br />Laborer 24 hours 90$ 2,160 <br />Labor OT 4 hours 126$ 504 <br />American Jetting 1 Invoice 2,433$ 2,433 <br />Mandatory Sunday DT Labor 8 hours 162$ 1,296 <br />31,712 <br />1,500 <br />Bond <br />TOTAL 33,212 <br />Request for Change <br />Arden Hills Watermain Break <br />Repair of watermain after a 45 degree bend was revealed to be <br />leaking <br />Mobilization <br />Sub Total <br />____________________________________________ ____________________________ <br />Mayor Date