My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-18-2001 PTRC Meeting Minutes
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes (1999 to Present)
>
1999-2009
>
2001
>
12-18-2001 PTRC Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2024 12:13:09 AM
Creation date
7/21/2022 4:19:38 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Four phases to Create a'.SigltegeA's,#em ' <br /> Phase 1. Planning <br /> A. Analysis of project requirements for graphic cpmmunication <br /> 1 Survey existing:or planned site co.hditio6�s; project facilities and existing signs if <br /> any. <br /> 2. Review architects plans.of existinq,.and/o�fUt:ore facilities. <br /> 3 Obtain necessary info rm at!on:cone:�rning bpeci ing and functional requirements <br /> for the facility or complex. <br /> 4 Determine requirements..for all`.Gdde,<and;l andicap orrregulatory signing. <br /> 5. Gather information and.review land.lord,sigr pli n;. <br /> City requirements/restrictions as_wefJIistorical::Preservation or other approval <br /> authorities. <br /> 6. Assess special client needs and,`requestl to arding project. <br /> B. Planning and schematic design <br /> 1, Develop concepts for a.Systert of.gfaphic"ele.rhents which will communicate <br /> information effectively, <br /> 2. Provide Preliminary.Graphics Schedule;it iecimplete list of graphic elements which <br /> includes recommended size, colors;wprding.,and.location for signs. <br /> 3. Using architects plans; show appro cimate.Vocattonsfor all items. <br /> 4. Provide schematic designs showing ap.pri5xi:m'ate,size and shape of signs. <br /> • 5 Review sign types,,copy and loCations;vii client for..approval. <br /> Phase 2. Design <br /> A. Final design <br /> 1. Using design techniques,as required ,develpp;designs for all signing and graphic <br /> items which were approved in Phase.1. <br /> 2. Design and/or select letter forms; alphabats;:etc,., for all items. <br /> 3. Select color and material:.for all items, <br /> B. Coordination <br /> 1 Review all design of signs.and graphids With-client, <br /> 2. Coordinate final copy,with client <br /> 3. Obtain cost estimates for sign fabr%cation; if;req:Gired... <br /> b0 ZZ �Z <br /> 39Vd 9NI hlI-ldNI9VWI 99�b-5GS-�i9 96hZ1Ei/�0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.