My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-18-2001 PTRC Meeting Minutes
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes (1999 to Present)
>
1999-2009
>
2001
>
12-18-2001 PTRC Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2024 12:13:09 AM
Creation date
7/21/2022 4:19:38 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�t <br /> Four phases to Create;a..Sllgnago.Syatetn:pd a 2. <br /> Phase 3. Doc umentation.:and Bidding ' <br /> A. Working drawings and specifications <br /> 1 Provide complete working drawings.for,all„Signing and graphic items. <br /> 2 Provide final specifications.for.all.c.o.lors:<.and materials. <br /> 3. Provide final location plans.and Graphics;Schi pule' of all items <br /> B. Competitive Bids <br /> 1. Select competent.bidders'for, the work:invoived.. <br /> 2. Issue documents for b.idding,and, revie�ti;di-awings with bidders. <br /> 3 Assist the owners, .if necessary, :in,bid:,(ie.gotiation.s. <br /> Phase 4. Implementation <br /> A. Supervision of fabricators work <br /> 1. Administer the awarding of contracts to..successful bidder as required. <br /> 2, Check and approve ,colors, shop,drawings arid-material samples provided <br /> by fabricator. <br /> 3 Inspect work in fabricatot's shop.,(V11hen,;appropriate) <br /> 4. Supervise installation of fabricators:work,.at aha project site. <br /> F <br /> B. Evaluation and future Implementation. <br /> 1. Provide drawings of.the'cdmp'leted aign.system. <br /> 2 Develop Sign Criteria or sign ord.ering,:Marludls''as required for the project under a <br /> separate design agreement.. <br /> 3. Review and evalua.te sign..system.after`it.has.been operating for a period of time. <br /> 4 Make changes or additions,to.the signs stp.m;as required under a separate <br /> design agreement. <br /> Additional Services: <br /> Fabrication and Installation <br /> Charges for above services;:are prepared oq..indiViiU61,needs basis <br /> S0 39tid �NI I�lI�tiNI9tiWI 99Zb-SbS-ZL9 LL �ZL 9b6L/EL/Ze <br />
The URL can be used to link to this page
Your browser does not support the video tag.