Laserfiche WebLink
09/27/02 01:26 FAX j02 <br /> • <br /> NAOEN, CHRISTEN BEN 6 Mal�w. /N <br /> A ROH IT CC TO <br /> MEMORANDUM <br /> To: <br /> Tom Moore—Arden hills FROM: Tim MdLwain <br /> DATC 9/26/02 <br /> COMM. NO: 0266 <br /> sua.,ccT: Cummings Park Warming Shelter COPIEe To: file <br /> Pricing&Project Schedule <br /> Project Cost Estimate <br /> The fdkmwing estimate of construction costs for the Warming/Picnic Shelter is based an the <br /> ConcePt/Schematic Design Package dated 9/18/02 prepared by Hagen, Christensen & MciLwaln <br /> Architects. <br /> The costs are based on historical cost/SF data for similar Projects in the Twin Cities metro area and <br /> are for the shelter construction only. Site utility costs were not identified because,the extent of that <br /> work has not been determined.Also,costs do not include an wxmise for winter construction. <br /> Construction costs are In 2003 dollars and a factor of 5%should be added for construction In 2004. <br /> Enclosed space 1,600 SF x 4150.00/SF= $240,000.00 <br /> (Storage,Toilet Rooms&Warming Space) <br /> Picnic Shelter(covered)space 1,050 SF x$8S.00/SF= $89,250.00 <br /> Patio Area/Garden Wall 1,100 SF x$12/SF= $13,200.00 <br /> Construction Cost Estimate Total $342,450.00 <br /> Project Scfiedule <br /> Start Date Schedule Item Duration <br /> Design 4 weeks <br /> Construction Documents g weeks <br /> Bidding/Building Permit/Plan Check 3ks <br /> Contract Award 4 yaks <br /> Start Construction 3112 months <br /> PH 61 2-904-1332 Fwx 61 2-904-7366 <br /> 2 1 2 THIRD A V C N u C NORTH S U I T E 350 N I W N C A P p L I S. 04. S S 4 O 1 <br />