My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-15-22-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
08-15-22-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2022 2:14:26 PM
Creation date
8/11/2022 2:13:48 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br />Budget Impact <br /> <br />The fee for services will be based on a time and material basis (Not to exceed $16,600) and <br />include the following tasks: <br />1. Data Gathering <br />2. Desktop Analysis <br />3. Field Reconnaissance <br />4. Analysis <br />5. Technical Memorandum <br /> <br />Deliverables will include a final Memorandum with retrofit recommendations and preliminary <br />costs. <br /> <br />This study will be used to support grant opportunities through the Minnesota Board of Water and <br />Soil Resources, Clean Water Fund Program. <br /> <br />The City of New Brighton has expressed an interest in partnering on this project. It is currently <br />estimated that they may cover 25% of the cost of this analysis. Our Surface Water Management <br />Fund will need to cover the remaining cost with fund balance. <br /> <br />Attachments <br /> <br />Attachment A - Water Quality BMP Analysis Presentation <br />
The URL can be used to link to this page
Your browser does not support the video tag.