My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-29-1985 PTRC Agenda - Minutes
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes/Packets/(1968 to 2009)
>
1980-1989
>
1985
>
01-29-1985 PTRC Agenda - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2024 4:57:27 PM
Creation date
8/12/2022 10:10:52 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• RIGHT-OF-WAY AND TRAFFIC VOLUME ANALYSIS <br /> Traffic(a) <br /> Route Row Width Volumes <br /> 1. Lake Johanna Blvd. 4,900 <br /> Co. Rd. D to east limit of Tony Schmidt Park 66' <br /> East limit of Tony Schmidt Park to Snelling 30' <br /> 2. Snelling Ave. 4,400 <br /> Hwy. 51 to Co. Rd. E 200' <br /> Co. Rd. E to 694 100' <br /> 3. Co. Rd. E-2 86' 5,400 <br /> 4. Hamline Ave. 66' 7,000(b) <br /> 5. Co. Rd. D 66' 5,400 <br /> (a) Indicates 1982 ADT on the most travelled portion of the route. <br /> (b) Based upon consultation with the City Traffic Engineer, Hamline <br /> Avenue is the only candidate route anticipated to exceed 8,000 <br /> ADT in the future. <br /> ALTERNATIVE PARKWAY CROSS-SECTIONS <br /> The following sketches of roadway cross-sections graphically depict the <br /> CSAH standards identified on page 1, paragraph 2. These cross-sections <br /> are shown related to the varying right-of-way widths of candidate routes. <br /> All alternatives assume separated bike/pedestrian paths to reduce the <br /> width of paved roadway and to improve safety. <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.