My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-24-1984 PTRC Agenda - Minutes
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes/Packets/(1968 to 2009)
>
1980-1989
>
1984
>
07-24-1984 PTRC Agenda - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:15:33 AM
Creation date
8/12/2022 10:39:22 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• TO: Council <br /> FROM: Tom Mulcahy <br /> SUBJECT: Parkway Study <br /> DATE: July 9 , 1984 <br /> I would like again to bring before the Council my <br /> proposal that we authorize a conceptual design study that <br /> would look into the possibility of a system of parkways in <br /> Arden Hills . <br /> I believe that a professional study--under the <br /> direction of the City Planner and involving a task force <br /> that includes interested members of the Planning Commission <br /> and Parks Committee--could give us needed direction in <br /> preparing a long range plan for a parkway system to be <br /> integrated into the City' s existing Transportation Plan. <br /> This idea has been perking in my mind for over two <br /> years . It ' s time it had professional study and evaluation. <br /> The planner and members of the Planning Commission and the <br /> • Parks Committee have the necessary expertise and interest to <br /> look at the possibilities and to come up with feasible <br /> recommendations for long term action. <br /> These things take time--to study, to secure <br /> citizen and professional input, to generate awareness and <br /> support--and, I think, that it' s time to get that process <br /> started. <br /> Orlyn Miller and I have prepared the attached <br /> proposal for a Parkway Plan Study and I request your <br /> favorable consideration. <br /> The estimated maximum cost of this activity is <br /> $2 , 500 . I propose that it be funded from the Parks Capital <br /> Fund and from Planning Consultant funds and that the work <br /> begin immediately. I believe that the study would take <br /> several months and we would have a report in early 1985. <br /> Funding should be provided in the 1985 budget. <br /> TRM: -)mg <br /> Attachment <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.