Laserfiche WebLink
14 <br />Option 2: Bypass (Stage 1) <br />•Relocate private utilities <br />•Replace/Repair public <br />utilities <br />•Build temporary bypass in <br />NW quadrant (need light <br />pole) <br />•Widen south side of east <br />and west legs by 12' (lots <br />of utilities in this area) <br />•Traffic: <br />–All traffic movements <br />open (but may need <br />some temporary lane <br />closures for utility work) <br />Project Update