Laserfiche WebLink
15 <br />Option 2: Bypass (Stage 2) <br />•Construct ~75% of <br />Roundabout <br />•Consider temporary <br />drainage needs <br />•Add lighting and critical <br />Roundabout signage <br />where possible <br />•Traffic: <br />–Move traffic onto <br />bypass/widened areas <br />–New 3-legged <br />intersection is all way <br />stop with no turn lanes <br />–Northbound converted <br />to “Out Only” with side <br />street stop <br />Project Update