Laserfiche WebLink
3. The bond or surety shall be provided prior to the issuance of any building or <br />grading permits and shall be valid for, two full years, from the date of installation, or three <br />years in the case of an extended timeline. <br /> 4. For any landscaping or screening that is not in accordance with the approved <br />landscaping plan at the end of two growing seasons, the applicant shall replace the material <br />to the satisfaction of the city before the guarantee is released. Where this is not done, the <br />city, at its sole discretion, may use the proceeds of the performance guarantee to <br />accomplish performance. <br /> F. Minimum Landscape Requirements. <br /> 1. Caliper Inches. The minimum caliper inches required per building site shall relate <br />to the gross square footage of all floors of a building and the building height. A single story <br />building in excess of thirty (30) feet in height shall be considered a two-story building for <br />the purposes of determining gross square footage. Minimum total caliper inches = <br /> Gross Square Footage of all Floors of Building <br /> 320 <br /> 2. Tree Ratio. The minimum total caliper inches shall contain the following minimum <br />percentages of trees in various size ranges: <br /> <br />Building Height In Stories <br />Percentage of Trees of Various Caliper Inches <br />2.0" - 3.0" <br />3.5" - 4.0" <br />4.5" - 6.0" <br />1-2 <br />50 % <br />30 % <br />20 % <br />3-4 <br />50 % <br />30 % <br />20 % <br />5 and over