My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-19-22-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
09-19-22-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2022 3:31:37 PM
Creation date
9/19/2022 3:30:43 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Method of Installation. All deciduous and coniferous trees shall be planted in <br />accordance with American Standards for Nursery Stock relating to quality of stock and <br />appropriate sizing of the root ball for balled and burlapped and spade-moved trees. <br /> 5. Slopes and Berms. Final slopes greater than the ratio of 3:1 will not be permitted <br />without special approval or treatment, such as special seed mixtures or reforestation, <br />terracing, or retaining walls. Berming used to provide required screening of parking lots <br />and other open areas shall not have slopes in excess of 3:1. <br /> 6. Landscape Plan Maintenance. Quantity and character of landscaping, as originally <br />approved, shall be maintained in perpetuity by the property owner unless the City <br />approves a change to the landscaping plan. Maintenance shall include removal of litter, <br />dead plant materials, unhealthy or diseased trees, and necessary pruning. Natural <br />watercourses within a buffer shall be maintained as free flowing and free of debris. <br /> 7. Erosion Control. All areas of any site shall be restored and maintained in <br />accordance with provisions of the city erosion control standards, and other requirements <br />of the Code. <br /> 8. Placement of Trees and Shrubs. No trees or shrubs shall be planted within any <br />drainage/utility easements, road right-of-way, or where it would now or in the future <br />materially impede the clear vision area or other driveway between a height of two and one- <br />half (2-1/2) and ten (10) feet in the clear vision area. (revised 3/18/09) <br /> 9. Completion Deadline. All plants required for screening purposes shall be planted to <br />completion within six months from date of issuance of a building permit unless otherwise <br />approved by the city due to the time of the year or if an alternative schedule is set in a <br />development agreement. In no case shall the period exceed six months from issuance of the <br />certificate of occupancy. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.