Laserfiche WebLink
8/30/2022 Page 7 of 16 <br />SRF Consulting Group, Inc.Work Tasks and Person-Hour Estimates <br />Client:City of Arden Hills <br />Project:MVHS Trail - Final Design Amendment <br />Subconsultants:Braun Intertec 14320.PP <br />TASK NO.TASK DESCRIPTION PROF. VIII-VII PROF. VI PROF. V PROF. IV PROF. III PROF. II PROF. I TECH.SUPPORT TOTALS EST. FEE <br />PRIN.SR. ASSOC.SR. ASSOC.ASSOC.SR. PROF.PROF.PROF.HIDE THIS ROW <br />6.0 CONSTRUCTION ADMINISTRATION <br />Assumptions: <br />Construction completed in 8 weeks of active construction in 2023. <br />Assumes concrete, soils and aggregates to be tested by Braun Intertec per MnDOT's 2020 Standard Specifications for Construction and 2022 SALT Schedule of Materials Control (see Subconsultants). <br />Assumes bituminous and concrete plant inspections are by MnDOT. Bituminous verifications samples, and misc materials samples to be tested by MnDOT. <br />Assume average of 6 hours/wk during active construction, plus additional time for project kick-off. <br />Client Deliverables: <br />6.1 Construction Administration 3 --60 -----63 $9,744.00 <br />Task includes the following items: <br />Regular communication with City Staff and other Stakeholders throughout the project. <br />Ensure required submittals are distributed and reviewed within required time allowed. Including contractor compliance with wage and labor provisions. <br />Attend preconstruction conference <br />Perform weekly on-site review of project's work and status report to the City <br />Coordinate and lead weekly progress meetings <br />Review periodic pay request forms prepared by Ramsey County <br />Prepare Change Orders and other written directives, if required. Complete price negotiations with construction contractor, and obtain MnDOT State Aid funding approval. <br />Complete engineering field revisions as necessary to construct the project. <br />Prepare letter of final review and acceptance. <br />Approve shop drawings, material list reports, and all other information on material to be used for construction in accordance with the plans and specifications. <br />Coordinate and anticipate utility conflicts, relocations, and adjustments and provide recommendation to the County. <br />Communicate with adjacent property owners and address community concerns as needed during construction. <br />SRF Deliverables: <br />SUBTOTAL - TASK 6 3 0 0 60 0 0 0 0 0 63 $9,744.00 <br />SRF CONSULTING GROUP, INC. <br />14320ScopeOfWorkTemplateDetailed_REV.xlsx <br />MINNEAPOLIS. MN