Laserfiche WebLink
8/30/2022 Page 8 of 16 <br />SRF Consulting Group, Inc.Work Tasks and Person-Hour Estimates <br />Client:City of Arden Hills <br />Project:MVHS Trail - Final Design Amendment <br />Subconsultants:Braun Intertec 14320.PP <br />TASK NO.TASK DESCRIPTION PROF. VIII-VII PROF. VI PROF. V PROF. IV PROF. III PROF. II PROF. I TECH.SUPPORT TOTALS EST. FEE <br />PRIN.SR. ASSOC.SR. ASSOC.ASSOC.SR. PROF.PROF.PROF.HIDE THIS ROW <br />7.0 CONSTRUCTION INSPECTION <br />Assumptions: <br />Assume average of 20 hours/wk during active construction, plus additional time for project kick-off. <br />Client Deliverables: <br />7.1 Construction Inspection ----180 ----180 $22,500.00 <br />Task includes the following items: <br />Perform observation and keep daily records of the construction activities of the Contractor and utility companies. <br />Keep record of the quantities of each of the pay items used in the work. Periodically review the Contractor's progress. <br />Perform field measurements for use in the measurement of quantities and preparation of record plans. <br />Arrange for construction staking as required by the Contractor's progress. <br />Upon substantial completion, prepare the "punch list." <br />Perform and coordinate testing of materials in accordance with the MnDOT State Aid materials control schedule. <br />Coordinate and review the testing of materials. <br />Prepare the final inspection letter <br />Conduct Warranty inspection. <br />Provide pre-project documentation in digital, date stamped, and cataloged format showing detailed conditions of the existing corridor. <br />Provide construction photo documentation in digital, date stamped, and cataloged format showing detailed conditions of the construction progress. <br />Assist contractor with coordination of private utility relocations, as needed. <br />Review and enforce daily traffic control inspection reports/devices for conformance with the MnMUTCD. <br />Review erosion control devices and contractor erosion control inspection reports for conformance with the contract documents and MPCA. <br />Review compliance with ADA and PROWAG requirements during construction of applicable facilities. <br />SRF Deliverables: <br />SUBTOTAL - TASK 7 0 0 0 0 180 0 0 0 0 180 $22,500.00 <br />SRF CONSULTING GROUP, INC. <br />14320ScopeOfWorkTemplateDetailed_REV.xlsx <br />MINNEAPOLIS. MN