Laserfiche WebLink
8/30/2022 Page 10 of 16 <br />SRF Consulting Group, Inc.Work Tasks and Person-Hour Estimates <br />Client:City of Arden Hills <br />Project:MVHS Trail - Final Design Amendment <br />Subconsultants:Braun Intertec 14320.PP <br />TASK NO.TASK DESCRIPTION PROF. VIII-VII PROF. VI PROF. V PROF. IV PROF. III PROF. II PROF. I TECH.SUPPORT TOTALS EST. FEE <br />PRIN.SR. ASSOC.SR. ASSOC.ASSOC.SR. PROF.PROF.PROF.HIDE THIS ROW <br />9.0 SUBMISSION OF WORK / AS-BUILT PLAN <br />Assumptions: <br />Client Deliverables: <br />9.1 Final Inspection, Review and File Transfer ---10 -20 ---30 $3,930.00 <br />Task includes the following items: <br />Conduct final review of the project. <br />Prepare final letter of acceptability. <br />Finalize documentation according to MnDOT State Aid rules. <br />Electronic documentation access will be available through ProjectWise throughout project, if desired. Transfer final documentation via Client approved format, if alternate method desired. <br />9.2 As-Builts ---10 -20 ---30 $3,930.00 <br />Task includes the following items: <br />Obtain record information from field representatives <br />Prepare record drawings <br />Submit copies of record drawings to the City via Client approved format <br />SRF Deliverables: <br />SUBTOTAL - TASK 9 0 0 0 20 0 40 0 0 0 60 $7,860.00 <br />SRF CONSULTING GROUP, INC. <br />14320ScopeOfWorkTemplateDetailed_REV.xlsx <br />MINNEAPOLIS. MN