Laserfiche WebLink
8/30/2022 Page 9 of 16 <br />SRF Consulting Group, Inc.Work Tasks and Person-Hour Estimates <br />Client:City of Arden Hills <br />Project:MVHS Trail - Final Design Amendment <br />Subconsultants:Braun Intertec 14320.PP <br />TASK NO.TASK DESCRIPTION PROF. VIII-VII PROF. VI PROF. V PROF. IV PROF. III PROF. II PROF. I TECH.SUPPORT TOTALS EST. FEE <br />PRIN.SR. ASSOC.SR. ASSOC.ASSOC.SR. PROF.PROF.PROF.HIDE THIS ROW <br />8.0 CONSTRUCTION SURVEY <br />Assumptions: <br />Client Deliverables: <br />8.1 Construction Survey ---16 50 50 ---116 $14,716.00 <br />Task includes the following items: <br />Coordinate staking requirements with field representatives <br />Computations as necessary for field crews <br />Stake limits of construction <br />Alignment and grades for storm sewer <br />Alignment and grades for curb and gutter <br />Alignment and grades for driveway pavement <br />Final grades for top of aggregate base <br />Alignment and grades for walks and trails <br />Final grades for top of castings <br />Alignment and grades for retaining wall <br />Stake other facilities as necessary <br />Gather survey information for as-built plans <br />SRF Deliverables: <br />SUBTOTAL - TASK 8 0 0 0 16 50 50 0 0 0 116 $14,716.00 <br />SRF CONSULTING GROUP, INC. <br />14320ScopeOfWorkTemplateDetailed_REV.xlsx <br />MINNEAPOLIS. MN