My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-17-22-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
10-17-22-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2022 11:55:46 AM
Creation date
10/13/2022 11:54:51 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br /> <br />AGENDA ITEM – 1C <br /> <br />MEMORANDUM <br /> <br />DATE: October 17, 2022 <br /> <br />TO: Honorable Mayor and City Councilmembers <br /> Dave Perrault, City Administrator <br /> <br />FROM: David Swearingen, P.E. Public Works Director / City Engineer <br /> <br />SUBJECT: Floral Park Improvements <br /> <br /> Budgeted Amount: Actual Amount: Funding Source: <br /> $606,000 – Floral Park $TBD PIR – Parks <br /> <br /> <br />Council Should Consider <br /> <br />• Moving forward with the Floral Park Improvements <br />• Replace existing park shelter <br />• Amending HR Green contract for professional services <br /> <br />Background/Discussion <br /> <br />The Floral Park playground structure was built in 2001, through the City’s Park Maintenance <br />Management Plan, park equipment is to be considered for replacement on a 20-year cycle. <br />Within the 2023-2027 CIP, Floral Park is programmed for improvements in 2023. City staff has <br />inspected Floral Park, Council should review Attachment B which provides pictures for <br />reference. Also, within the 2023-2027 CIP, the shelter at Floral Park is budgeted to be replaced. <br /> <br />Recommended Improvements: <br />Replace the play structure: The structure will be 22 years old in 2023, through inspection there <br />are visible signs of deterioration of the protective rubber coating around the structure. The mulch <br />and the containment timbers are beginning to rot. City staff has received some complaints from <br />users of the equipment that they would like to see repairs or replacement. <br /> <br />Rehabilitation of the bituminous trail loop: About 1000-feet of trail are recommended by staff to <br />rehab by reclamation and paving. Looking at the history of maintenance activities, this trail <br />segment received a slurry seal about ten years ago to extend the useful life. Through inspection,
The URL can be used to link to this page
Your browser does not support the video tag.