Laserfiche WebLink
Amendment 1 to Professional Services Agreement <br />Arden Manor and Floral Parks Playground Equipment Replacement and Reconstruction Design and <br />Construction Administration Services <br />211646 <br />Page 2 of 4 <br />H RG reen <br />SCOPE OF SERVICES <br />Arden Manor and Floral Parks Playground Equipment Replacement and Reconstruction Design and <br />Construction Administration Services <br />Arden Hills, Minnesota <br />Amendment #1 <br />(Floral Park Additional Improvements) <br />The scope of services for this amendment represents the City of Arden Hills' (City) request to HR Green, Inc. <br />(Consultant) to provide additional services for the project. The services performed by the Consultant will be in <br />accordance with generally accepted standards of practice. <br />Additional Services <br />The work tasks include: <br />Task 8 — Floral Park Additional Improvements <br />The City has requested that the Consultant provide services for additional improvements to Floral Park beyond <br />the sport court improvements to which the original lump sum fee estimate was limited. Additional improvements <br />include trail reconstruction around the main park site and a new trail connection between the main park site and <br />the sport courts, playground replacement, park shelter improvements, adding maintenance gates to the tennis <br />court fences, dead and diseased tree removal, ADA accessible ramp design, community garden water source <br />improvements, a possible water system connection, and various other improvements. The exact nature of the <br />improvements is dependent on public input, and for the purposes of this amendment, the tasks and fee estimate <br />are at a general level. <br />Task 8.1 — Geotechnical Services <br />a. Geotechnical Evaluation — Consultant will perform a geotechnical evaluation to characterize surface and <br />subsurface geologic conditions at selected exploration locations, evaluate their impact on the project, and <br />provide geotechnical recommendations for the design and construction of the proposed additional park <br />improvements. <br />Task 8.2 — Survey Services <br />a. Topographic Survey — Consultant will complete a topographic survey of the additional park improvement <br />sites including playground and trail infrastructure. Elevations will be referenced to local benchmarks. <br />These services will be coordinated with the City and the adjacent property managers. <br />b. Boundary and Topographic Drawing — Final drafting to be completed with existing visible improvements <br />on subject property in the area of the additional improvements shown. The drawing will be completed <br />and will be used as the base map for the project. Because the final drawing will be incorporated into the <br />engineering plans, a Topographic Survey Plat is not included within this proposal. <br />Task 8.3 — Public Involvement <br />a. Consultant will prepare signage and web based tools for the public to use to provide input on the park <br />amenities for the additional improvements. <br />b. Consultant will collect interactive feedback and develop ideas and options for the additional <br />improvements. <br />Version1.0 07012017 <br />