Laserfiche WebLink
building will be designed with truck loading docks to speed up the distribution function of <br />the building. Building D will have ample parking with 422 parking stalls. <br /> <br />Please note the proposed site plan incorporates a dedicated entry point into Arden Hills <br />Business Commons. Storm water ponds will be designed to encourage wildlife habitats <br />to form and enhance the overall character of the various green spaces throughout the <br />entire development. The site plan also includes walking trails for corporate users <br />connecting all buildings at Arden Hills Business Commons. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />