My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-17-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
01-17-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2023 12:36:52 PM
Creation date
1/12/2023 4:11:22 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NARRATIVE <br />ARDEN HILLS BUSINESS COMMONS <br />January 4, 2023 <br /> <br /> <br />OPTION B: <br /> <br />Global One Commercial and their architectural team at Tushie Montgomery Architects <br />has put together two (2) different concept plans for the roughly 62 acre Hillview site at <br />the former Twin Cities Army Ammunition Plant (“TCAAP”) located in Arden Hills, MN. <br />We have named this industrial development Arden Hills Business Commons. Option B <br />at Arden Hills BC incorporates two (2) different multi-tenant buildings with a combined <br />square footage of 1,028,000 Square Feet (“SF”). <br /> <br />The first building (Building A) is a large fulfillment center of 656,000 SF designed for a <br />single user distribution company. The building will have 35 foot internal clear height for <br />increased product shelving needs. The total height of the building will be less than 45’ <br />maximum. There will be second floor mezzanine space available for the tech <br />company’s back office workforce. The building will be designed with truck loading <br />docks to speed up the distribution function of the building. Building A will have ample <br />parking of 488 stalls. <br /> <br />The second building (Building B) is a 372,000 SF large sized distribution center. This <br />building will feature 35 foot internal clear height for increased product shelving needs. <br />The total height of the building will be less than 45’ maximum. Second floor mezzanine <br />space could also be built into this building depending on required office space needs. <br />The building will be designed with truck loading docks to speed up the distribution <br />function of the building. Building B will have ample parking with 368 parking stalls. <br /> <br />Please note the proposed site plan incorporates a dedicated entry point into Arden Hills <br />Business Commons. Option B also incorporates three (3) different areas for truck <br />parking as this option is designed to be a fulfillment center and distribution center for <br />two (2) different corporate users. Storm water ponds will be designed to encourage <br />wildlife habitats to form and enhance the overall character of the various green spaces <br />throughout the entire development. The site plan also includes walking trails for <br />corporate users connecting all buildings at Arden Hills Business Commons. <br />
The URL can be used to link to this page
Your browser does not support the video tag.