Laserfiche WebLink
BLDG A <br />260' x 800' <br />208,000 SF <br />BLDG B <br />260' x 800' <br />208,000 SF <br />BLDG C <br />260' x 600' <br />156,000 SF <br />BLDG D <br />1,100' x 310' <br />341,000 SF <br />LOADINGLOADING <br />STORM WATER <br />POND <br />SELF <br />STORAGE <br />3 LEVELS <br />120' x 200' <br />72,000 SF <br />STORM WATER <br />POND <br />B ST <br />A ST <br />D STMOUNDSVIEW BLVDN MAGAZINE RDSTORM WATER <br />POND <br />SECURED OUTDOOR <br />STORAGE <br />LOADINGLOADINGENTRY INTO <br />DEVELOPMENT <br />COUNTY ROAD I WEST <br />MOUNDSVIEW BLVD© 2022 TUSHIE-MONTGOMERY & ASSOCIATES, P.C. <br />TUSHIE MONTGOMERY <br />ARCHITECTS <br />ARDEN HILLS BUSINESS COMMONS (HILLVIEW SITE AT TCAAP) <br />COUNTY ROAD I W <br />ARDEN HILLS MN 55112 <br />12.29.2022 <br />OPTION A <br />222150A <br />SCALE:1" = 240'-0" <br />1 PROPOSED SITE PLAN <br />SCALE:1" = 1000'-0" <br />2 OVERALL SITE PLAN <br />TOTAL SF: 985,000 SF <br />SELF STORAGE (3 LEVELS): 72,000 SF <br />BUILDING A: 208,000 SF <br />BUILDING B: 208,000 SF <br />BUILDING C: 156,000 SF <br />BUILDING D: 341,000 SF <br />TOTAL PARKING ESTIMATE: 898 <br />SURFACE BLDG A: 168 <br />SURFACE BLDG B - C: 308 <br />SURFACE BLDG D: 422 <br />SITE INFORMATION: ±62 ACRES <br />SITE AREA (APPROX): (±2,700,720 SF) <br />ZONING SUMMARY: <br />EXISTING ZONING CD- CONSERVATION <br />DISTRICT: DISTRICT <br />PROPOSED ZONING PROPOSED I-2 <br />DISTRICT: <br />LOT COVERAGE:± 937,000 SF <br />I-2 40% MAXIMUM 34.7% PROVIDED <br />LANDSCAPE AREA:± 709,998 SF <br />I-2 25% MINIMUM 26.3% PROVIDED <br />FAR: <br />I-2 0.8 MAXIMUM 0.37 PROVIDED <br />SETBACKS: <br />I-2 50' MINIMUM <br />STRUCTURE HEIGHT: <br />I-2 45' MAXIMUM <br />DEVELOPMENT SUMMARY