Laserfiche WebLink
Minimum Landscape <br />Not specified, but not <br />Lot Area <br />65% of lot area <br />65% of lot area <br />seeking flexibility <br />Maximum PUD Density <br />12 units/acre <br />N/A <br />14.95 units/acre 124 <br />Defaults to R-4 as <br />To be verified as part of <br />Minimum Front Yard <br />nonriparian lot <br />future land use <br />Setback <br />40 feet <br />application <br />Defaults to R-4 as <br />To be verified as part of <br />Minimum Rear Yard <br />nonriparian lot <br />future land use <br />Setback <br />30 feet <br />application <br />Defaults to R-4 as <br />To be verified as part of <br />Minimum Side Yard <br />5 feet (min)/15 feet <br />nonriparian lot <br />future land use <br />Setback <br />(total) <br />application <br />124 +/- enclosed <br />1.1 stall/1 bedroom <br />105 +/- surface <br />2 stall/2+ bedroom <br />N/A <br />Flexibility would not be <br />Off -Street Parking <br />CUP 1 enclosed/unit <br />requested <br />Stormwater & Wetlands <br />The Applicant has stated as part of the site grading that a stormwater retention pond will be <br />created on the south side of the proposed development. Additionally, they anticipate there may <br />be the need to construct an underground retention system due to space constraints of the site. At <br />this time, the Applicant has indicated no other details are known on the scope of this work, but as <br />the project progresses they will develop those engineered plans for the City Engineer to review. <br />As noted above, the Concept Review submittal documents included a Wetland Delineation <br />Report. Similarly, to stormwater management, the Applicant has indicated they are working <br />through the logistics of the location of existing wetlands and impacts to placement of site <br />development. They've identified from the wetland delineation that the existing drainage/wetland <br />easements are no longer in alignment with actual wetlands. The Applicant recognizes that if they <br />decide to move forward with the project that existing easements will need to be vacated and new <br />easements shall be dedicated as part of the platting process. <br />Page 7 of 8 <br />