Laserfiche WebLink
Bolton & Menk, Inc. <br />Proposal QTB172950 <br />February 17, 2023 <br />Page 5 <br />Arsenic by EPA 6020 <br />Copper by EPA 6010 or 6020 <br />Polycyclic Aromatic Hydrocarbons listed in Table A-1 of MPCA Guidance Document <br />For the purpose of this proposal, we assume 10 soil samples will be submitted for chemical analysis. <br />Standard Pace Analytical Services quality assurance/quality control (QA/QC) procedures will be used. <br />The samples will be analyzed within a turnaround time of approximately 10 working days. <br />Reporting <br />We will prepare a letter report describing our sampling goals, methodology, and results. Approximate <br />sampling locations will be plotted on aerial photographs. The laboratory data will be tabulated and the <br />tables provided to you along with the laboratory report(s). The MPCA Level 1 and Level 2 Soil Reference <br />Values will be included in the table and concentrations exceeding either of those values will be <br />highlighted. <br />Project Schedule <br />We anticipate performing our work according to the following schedule. <br />■ Drill rig mobilization — within about 4 weeks following receipt of written authorization <br />■ Geotechnical field exploration —1 day on site to complete the work <br />■ Pond sediment sampling — 2 days on site to obtain the samples <br />■ Geotechnical classification and laboratory testing — within 1 to 2 weeks after completion of <br />field exploration <br />■ Pond sediment subcontract laboratory testing — typically within 2 weeks after completion of <br />field sampling <br />■ Preliminary results — within 1 week after completion of field exploration; within 2 to 3 weeks <br />after collection of pond sediment samples <br />■ Final report submittal — within 2 weeks after completion of the field and laboratory testing <br />If we cannot complete our proposed scope of services according to this schedule due to circumstances <br />beyond our control, we may need to revise this proposal prior to completing the remaining tasks. <br />BRAVN <br />INTERTEC <br />