Laserfiche WebLink
Bolton & Menk, Inc. <br />Proposal QTB172950 <br />February 17, 2023 <br />Page 6 <br />Fees <br />We will furnish the services described in this proposal for a lump sum fee of $14,715. Table 1 provides a <br />breakdown of the proposed fees. <br />Table 1. Proposed Fee Breakdown <br />Service <br />Fee <br />Geotechnical Scope <br />Staking and Utility Clearance <br />$ 805 <br />Drilling <br />1,890 <br />Laboratory Testing <br />240 <br />Coordination, Engineering Analysis, and Report <br />1,735 <br />Geotechnical Scope Total <br />$ 4,670 <br />Stormwater Pond Sediment Sampling <br />Field Services <br />$ 4,115 <br />Subcontractor Analytical Testing <br />3,340 <br />Project Management and Reporting <br />2,590 <br />Stormwater Pond Sediment Testing Total <br />$10,045 <br />Combined Scope Total <br />$14,715 <br />Our work may extend over several invoicing periods. As such, we will submit partial progress invoices for <br />work we perform during each invoicing period. <br />Additional Services <br />Our fees do not include potential costs due to the need for snow plowing, towing, stand-by time or work <br />that is not included in the above Scope of Services. We will charge costs for snow plowing or towing (if <br />necessary) at a rate of 1.15 times the actual cost. For stand-by time (defined as time spent by our field <br />crew due to circumstances that are beyond the control of our field crew or its equipment, or beyond the <br />scope of services indicated above), we will charge a rate of $300 per hour. <br />General Remarks <br />We will be happy to meet with you to discuss our proposed scope of services further and clarify the <br />various scope components. <br />We appreciate the opportunity to present this proposal to you. Please sign and return a copy to us in its <br />entirety. <br />We based the proposed fee on the scope of services described and the assumptions that you will <br />authorize our services within 30 days and that others will not delay us beyond our proposed schedule. <br />BRAVN <br />INTERTEC <br />