Laserfiche WebLink
Attachment B <br />Preliminary 2023 Work Plan <br />Institution Community Work Crew (ICWC) <br />City of Arden Hills <br />Updated- 2/27/2023 <br />Draft <br />Work Item <br />Decription <br />Estimated ICWC <br />Crew Hours <br />****All work scheduled on Saturday's**** <br />May <br />Install Landscape Mulch and Clean Gardens <br />Install landscape mulch to top dress perenial gardens. Install <br />new mulch around Highway 96 boulivard trees. <br />20 <br />June <br />Play Structure Mulch Installation <br />Top dress mulch with direcxtion from the May playground <br />inspection recommendations <br />10 <br />July <br />Valentine Park Drainage (Surface water from <br />Glenview) <br />Clean the drainage area/ rip rap (completed anually). Remove <br />vegatation as needed. <br />10 <br />Indian Oaks Trail Pond Maint. <br />cut down veatation per the planting plan. (Completed <br />anually) <br />5 <br />Misc. Outfall Cleaning <br />Locations provided, per map. <br />5 <br />August <br />2024 PMP Storm Sewer Maintenance Plan <br />Labor <br />Provide labor for cleaning out aprons, removing vegatation <br />along buffers <br />20 <br />Red Fox Area Pond and Drainange Labor <br />Vegatation and scrub tree removal, clean aprons, Clean <br />existing or install fabric and rip rap as needed <br />20 <br />September <br />Fence Replacment <br />Remove vegatation, and replace existing cedar split rail fence <br />along ROW retaining walls within the Seims Ct neighborhood. <br />30 <br />Buckthorn Removal <br />Location TBD <br />10 <br />October <br />Winterize Perenial Gardens <br />Cut and remove vegitation from city owned gardens <br />10 <br />Buckthorn Removal (Chatham Open Space) <br />Continue progress per the zone map. <br />20 <br />Buckthorn Removal <br />Location TBD <br />10 <br />November <br />Floral Park EAB Tree Removals Tenative <br />20 <br />Total (Estimated) Hours <br />140 <br />