My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
04-10-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 4:24:07 PM
Creation date
4/6/2023 4:26:51 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
forester or person designated by the City Manager. In order to remain responsive to emerging <br />research, the City reserves the right to request a change in formulation rates or application <br />methods for the duration of the contract. Any such change and additional costs incurred would <br />be agreed to in written correspondence between the Contractor and the City. <br />Ash Trees <br />1) All injections of ash trees must be with a liquid formulation of 4% Emamectin benzoate every <br />two years. No substitutions of the formulations shall be allowed. <br />2) Contractor shall inject Emamectin benzoate at a variable rate up to but not exceeding 5 ml <br />per diameter inch. Determination of dosage shall be on the inches of diameter at breast height <br />(DBH) within specific diameter classes listed in Attachment (B) and (C). <br />3) Injections must be made at the root flare to ensure the best distribution of the insecticide <br />throughout the tree. <br />Equipment: Rainbow Treecare will provide all necessary equipment to complete the Work <br />under these specifications: <br />1) Equipment will remain in proper operating condition throughout the term of the Agreement <br />and RTC is responsible for cleaning and providing upkeep to the injection system on a daily <br />basis. Any maintenance issues or repairs are the sole responsibility of Contractor. <br />2) Treatment technicians will use a high -helix drill bit and must replace the drill bits after every <br />100 DBH inches to maintain high efficiency. Drilled holes must be the size recommended by the <br />injection equipment manufacturer. <br />3) Injection holes on ash must be drilled to a depth of approximately 1 inch below the bark to <br />maximize delivery of Emamectin benzoate into ash trees. <br />4) Emamectin benzoate will be injected into ash trees using current industry standard injection <br />systems that have efficacy data that supports their use, and follow all manufacturers' <br />specifications. <br />5) All injected trees must be tagged with the year of injection clearly indicated on the tag. <br />Contractor shall provide tags for all injected trees. The tags must be of a design and type that <br />can persist on the tree for at least 3 years. <br />Property Access and Notification <br />Contractor shall not enter private property without having previously obtained permission from <br />the property owner. If Contractor personnel desire to enter private property to access trees on <br />a City owned property, it is their responsibility to notify the underlying property owner by <br />knocking on the door at the time of the site visit or making a phone call ahead of time. Every <br />
The URL can be used to link to this page
Your browser does not support the video tag.