Laserfiche WebLink
Lake Johanna Boulevard <br />Trail Design Study <br />Preliminary Design Development Report 19 September 27, 2022 <br />likely limited to temporary easements for minor grading, water quality basins or driveway reconstruction versus <br />permanent easement areas. A final determination of right of way acquisition needs will be made as a part of the <br />detail design process. <br />Trail Design Concept Evaluation <br />Evaluation matrices were created to understand how the trail options score against the design study <br />considerations. The study did not identify a preferred roadway and trail design concept. However, based on the <br />technical evaluation findings, input from the TAC and feedback received during public engagement, the west/north <br />alignment is more favorable than the east/south alignment. A trail on the west/north side would best address <br />project goals and likely result in fewer impacts. A formally recommended roadway and trail design will be <br />determined in a future design phase. At the time this report was developed, no funding for the future trail or <br />roadway design has been identified and there is no defined schedule for future construction. <br />More detailed evaluation matrices are included in Appendix E, and a layout of the west/north alignment is <br />included in Appendix F.