My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-20-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
03-20-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 8:39:38 AM
Creation date
4/7/2023 8:35:09 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2023 Parks Maintenance Plan <br />Maintaining the City Parks and city owned property is outlined in the Parks Maintenance Policy (PMP) <br />(last revised 2010) and outlines four levels of service. Some of the maintenance and techniques have <br />deviated since the last revision to this policy, to create a more efficient work flow, utilization of current <br />PW equipment, staffing, and products on the market. <br />Public Works utilizes four types of labor resources that will be referenced in the 2023 Plan. See below, <br />the types and abbreviations used in the plan. <br />x Full Time Public Works Staff (FTE) <br />x Seasonal part time Staff (SPT) <br />x MN Corrections Work Crew (ICWC) <br />x Volunteer Organizations/ Groups/ Individuals (VOL) <br />Routine park maintenance based on the level of service each park is assigned in the PMP, will receive <br />routine mowing, trimming, trash pickup, and misc. maintenance. <br />Floral Park asphalt trail maintenance (map below) will include spot replacement/ paving as needed. This <br />will be in conjunction with the 2023 PW Paving Project. Sections of trail will be evaluated for spot <br />replacement or reclaim and repaved. Removal of dead/ diseased trees and trees that either need to be <br />trimmed or removed as preventative maintenance will be completed prior to the trail project. <br />Restoration of green space disturbed by the project will take place after the paving is complete. Park <br />benches within the work area will ne assessed for repair or replacement needs as part of this project.
The URL can be used to link to this page
Your browser does not support the video tag.