My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-20-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
03-20-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 8:39:38 AM
Creation date
4/7/2023 8:35:09 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hockey Board Preventative Maintenance, pressure wash and seal the boards with a clear sealer at <br />Hazelnut Park. This project can be completed by VOL’s with the assistance of FTE’s. Hazelnut Park <br />hockey rink highlighted below. <br />Play Structure wood fiber/ mulch maintenance will be completed based on the spring playground <br />inspection measurements/ mulch depth. Monthly play structure inspections are completed during the <br />spring, summer, and fall months. During inspections, damaged or vandalized equipment will be replaced <br />and the structure is checked for overall safety. Floral and Arden Manor Parks will have mulch replaced as <br />part of the improvement project. <br />A full replacement of the play structure fiber mulch is scheduled for every 10 years as a guideline. Floral <br />Park, Arden Manor Park, Valentine Park and Royal Hills Park are proposed for this year.
The URL can be used to link to this page
Your browser does not support the video tag.