My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-20-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
03-20-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 8:39:38 AM
Creation date
4/7/2023 8:35:09 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HR Green, Inc. <br />Project B2204225 <br />October 3, 2022 <br />Page 3 <br /> <br /> <br /> Reviewing the background information and reference documents previously cited. <br /> <br /> Staking and coordinating clearing the exploration location of underground utilities. We <br />selected and staked the new exploration locations. We acquired the surface elevations and <br />locations with GPS technology using the State of Minnesota’s permanent GPS base station <br />network. The Soil Boring Location Sketch included in the Appendix shows the approximate <br />locations of the borings. <br /> <br /> Performing 13 standard penetration test (SPT) borings, denoted as ST-1 to ST-13, to nominal <br />depths of 5 feet below grade. <br /> <br /> Performing laboratory testing on select samples to aid in soil classification and engineering <br />analysis. <br /> <br /> Preparing this report containing a boring location sketch, logs of soil borings, a summary of <br />the soils encountered, results of laboratory tests, and recommendations for pavement <br />subgrade preparation and the design stormwater improvements and pavement sections. <br /> <br />Our scope of services did not include environmental services or testing and our geotechnical personnel <br />performing this evaluation are not trained to provide environmental services or testing. We can provide <br />environmental services or testing at your request. <br /> <br /> <br />B. Results <br /> <br />B.1. Geologic Overview <br /> <br />A review of the available geologic maps indicates the proposed trail alignment is generally underlain by <br />clayey till associated with the Des Moines Lobe. The till through this area is indicated as either moderate- <br />relief till (map unit “Qnm”) or high-relief till (map unit “Qnh”). The till forms hummocky, irregular <br />topography with relief of 60 to 100 feet where indicated as Qnh, and 40 to 70 feet of relief with round or <br />elliptical hills in areas indicated as Qnm. <br /> <br /> <br />36
The URL can be used to link to this page
Your browser does not support the video tag.