My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
06-12-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 10:36:16 AM
Creation date
6/9/2023 10:33:15 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />www.srfconsulting.com <br />3701 Wayzata Boulevard, Suite 100 | Minneapolis, MN 55416-3791 | 763.475.0010 <br />Equal Employment Opportunity / Affirmative Action Employer <br /> <br />SRF 16750.PP <br />June 6, 2023 <br />David Swearingen, P.E. <br />Public Works Director / City Engineer <br />City of Arden Hills <br />1245 Highway 96 West <br />Arden Hills, MN 55112 <br />Subject: Proposal for Professional Services for Mounds View High School Trail Improvements <br />(PW-22-0104) <br />Arden Hills, Minnesota <br />Dear David Swearingen: <br />Based on your request, SRF Consulting Group, Inc. (SRF) is pleased to submit this proposal to <br />provide professional services for a proposed trail along Old Highway 10from Lake Valentine Road <br />to Lakeshore Place. The major project elements are anticipated to include trail design, drainage <br />design, stormwater and wetland permitting with the Rice Creek Watershed District, <br />coordination with Ramsey County, and easement delineation. Trail will be 8 to 10-feet wide and is <br />proposed to be behind the curb with ADA ramps, retaining walls and storm sewer. <br />Scope of Services <br />We propose to carry out the work (“Scope of Services”), set forth in Attachments B and C, attached <br />hereto and incorporated into this Agreement. <br />Assumptions <br />Specifications, Final Permits, Project Manual, bidding support, construction administration are not <br />included, but are intended to be added by amendment at a later date, once construction timing is <br />better defined. <br />Construction anticipated in 2025/2026 or when funding is secure. <br />Schedule <br />We will complete this work within a mutually agreed-upon time schedule. Tentative project <br />schedule is intended to start Jun 2023 with 60% Plans Estimate ROW & Permits completed by <br />September 29, 2023 and 100% PE and permits completed by February 28, 2024. See Attachment C <br />for detailed schedule.
The URL can be used to link to this page
Your browser does not support the video tag.