My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
06-12-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 10:36:16 AM
Creation date
6/9/2023 10:33:15 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/6/2023 Page 2 of 11 <br />SRF Consulting Group, Inc.Work Tasks and Person-Hour Estimates <br />Client:CITY OF ARDEN HILLS <br />Project:OLD HIGHWAY 10 TRAIL <br />P16750.PP <br />TASK NO.TASK DESCRIPTION DIRECTOR SR. MANAGER DESIGN LEAD ENGINEER III ENGINEER II TECHNICIAN CLERICAL TOTALS EST. FEE <br />1.0 Project Coordination <br />Assumptions: <br />Client Deliverables: <br />Identify target City Council Meetings and forward invitation to SRF <br />1.1 Meet with City to review project scope and project schedule (2 hrs x 2 staff)2 2 0 0 0 0 0 4 $850 <br />1.2 Attend/participate in up to three Arden Hills City Council Meetings (3 hrs x 2 <br />staff) <br />9 9 0 0 0 0 0 18 $3,825 <br />1.3 Attend/participate in up to two Ramsey County Coordination Meetings (time <br />included in Task 8.3) <br />0 0 0 0 0 0 0 0 $0 <br />1.4 Attend/participate in up to two Rice Creek Watershed District Coordination <br />Meetings (time included in Tasks 6.1.4 and 6.6.4) <br />0 0 0 0 0 0 0 0 $0 <br />1.5 Independent Project QA/QC Review (3 submittals x 4 hours)0 0 12 0 0 0 0 12 $1,872 <br />1.6 Project Management (Billing, General Tasks) (1.5 hr x 6 months)9 0 0 0 0 0 0 9 $2,034 <br />1.7 Project Coordination (Client Biweekly Phone Check-Ins) (2 x 45 min x 6 months)16 16 0 0 0 0 0 32 $6,800 <br />1.8 MnDOT / State Aid Coordination 4 4 0 0 0 0 0 8 $1,700 <br />SRF Deliverables: <br />Schedule and run project meetings and check-in calls <br />SUBTOTAL - TASK 1 40 31 12 0 0 0 0 83 $17,081 83 <br />$205.80 <br />2.0 Project Survey <br />Assumptions: <br />Survey boundary must be approved by City Engineer prior to field work <br />Survey shall reference Ramsey County Coordinate System, NAD 83 (2011 Adj) <br />Elevations based upon NAVD88. Units in US Survey Feet to 0.01 foot Precision <br />Text file of all survey points, including project control, to be submitted to City <br />Engineer <br />Preliminary Design will proceed with LiDAR and be confirmed with topographic <br />survey in Spring 2024 for Final Design <br />Client Deliverables: <br />Approve proposed survey extents <br />Unless already triggered by GSOC, supply roadway/utility as-builts for existing <br />streets and previous trail projects <br />2.1 Survey Project Area, Locate Property Corner Monuments 0 8 0 0 0 80 0 88 $12,952 <br />2.3 Request and Convert GIS data for Use in AutoCAD (ROW, Aerial Image, LiDAR, <br />Planimetrics) <br />0 2 0 0 8 0 0 10 $1,398 <br />2.4 Assess private and public utilities within project limits. Complete GSOC Request. <br />Confirm/Refine Existing Utility Lines. <br />0 2 0 0 8 0 0 10 $1,398 <br />SRF CONSULTING GROUP, INC.ENGINEERS AND PLANNERS 16750.PP_Arden Hills Old Highway 10 Costs_edit 051823.xlsx <br />MINNEAPOLIS. MN
The URL can be used to link to this page
Your browser does not support the video tag.