My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
06-12-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 10:36:16 AM
Creation date
6/9/2023 10:33:15 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/6/2023 Page 3 of 11 <br />SRF Consulting Group, Inc.Work Tasks and Person-Hour Estimates <br />Client:CITY OF ARDEN HILLS <br />Project:OLD HIGHWAY 10 TRAIL <br />P16750.PP <br />TASK NO.TASK DESCRIPTION DIRECTOR SR. MANAGER DESIGN LEAD ENGINEER III ENGINEER II TECHNICIAN CLERICAL TOTALS EST. FEE <br />2.5 Conduct one (2) Utility Coordination meeting to review utility locations, <br />communicate project schedule and staging, and respond to utility owner <br />questions and concerns. (Note that second required utility coordination meeting <br />should be held as part of the preconstruction meeting) <br />0 0 0 6 6 0 0 12 $1,560 <br />2.6 Process raw survey data for Use in AutoCAD. Create Existing Ground surface.0 4 0 0 4 0 0 8 $1,296 <br />SRF Deliverables: <br />Topographic Survey (Submit to City Engineer) <br />Existing Utility Base File <br />Existing Ground Surface <br />SUBTOTAL - TASK 2 0 16 0 6 26 80 0 128 $18,604 128 <br />$145.34 <br />3.0 Geotechnical Investigation <br />Assumptions: <br />Geotechnical work performed by Subconsultant (Lump Sum Fee included in <br />Direct Non-Salary Expenses) <br />Client Deliverables: <br />Previous trail project as-builts to match retaining wall type <br />3.1 Prepare Geotechnical Recommendation Memorandum with Boring Logs (See <br />Direct Non-Salary Expenses to be Provided by Braun) <br />0 0 0 0 0 0 0 0 $0 <br />3.2 Coordination with Braun (Identify and Stake Boring Locations)0 2 0 0 2 2 0 6 $932 <br />SRF Deliverables: <br />Geotechnical Recommendation Memorandum with Boring Logs <br />SUBTOTAL - TASK 3 0 2 0 0 2 2 0 6 $932 6 <br />$155.33 <br />4.0 Public Engagement <br />Assumptions: <br />Conduct one public meeting during design process <br />SRF to prepare engagement graphics, promotional content and/or mailer to <br />support public engagement <br />SRF to prepare public meeting invitation and property owner survey for <br />distribution to residents <br />SRF will mail survey to residents <br />Client Deliverables: <br />Target Mailing List <br />Include Social Media and/or Website Content on City Sites <br />4.1 Community Engagement Plan 0 1 0 0 2 0 0 3 $449 <br />4.2 Community Engagement Meetings (2 meetings)6 6 0 0 16 0 0 28 $4,550 <br />4.3 Passive In-Person or Online Survey 1 4 0 0 8 0 8 21 $2,702 <br />4.4 Social Media/Website Promotional Materials 0 2 0 0 8 0 8 18 $2,078 <br />SRF CONSULTING GROUP, INC.ENGINEERS AND PLANNERS 16750.PP_Arden Hills Old Highway 10 Costs_edit 051823.xlsx <br />MINNEAPOLIS. MN
The URL can be used to link to this page
Your browser does not support the video tag.