My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-20-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
06-20-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 12:27:17 AM
Creation date
6/15/2023 3:38:39 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPINION OF PROBABLE PROJECT COST <br /> Arden Hills <br /> Park Improvements <br /> Jun 12,2023 <br /> Prepared by HR Green <br /> ITEM ITEM DESCRIPTION UNITS UNIT COST C.P.22-PARK-001 ESTIMATED <br /> NUMBER TOTAL COST <br /> FLORALPARK-SHELTER <br /> 2104.504 REMOVE CONCRETE SLAB SO YD $ 9.34 51 $ 476.34 <br /> 2104.602 REMOVE SHELTER EACH $ 2,107.05 1 $ 2,107.05 <br /> 2106.507 COMMON EMBANKMENT(CV) CU YD $ 7.91 1 $ 7.91 <br /> 2106.507 EXCAVATION-COMMON CU YD $ 22.30 111 $ 2,475.30 <br /> 2106.507 SELECT GRANULAR EMBANKMENT(CV) CU YD $ 32.41 94 $ 3,046.54 <br /> 2108.504 GEOTEXTILE FABRIC TYPE 5 SO YD $ 2.48 70 $ 174.15 <br /> 2401.507 STRUCTURAL CONCRETE(3G52) CU YD $ 2,248.12 1 13 $ 29,225.56 <br /> 2401.508 REINFORCEMENT BARS(EPDXY COATED) LB $ 5.52 2800 $ 15,456.00 <br /> 2502.503 4"PE PIPE DRAIN LIN FT $ 16.65 87 $ 1,448.55 <br /> 2502.503 4"PERF PE PIPE DRAIN LIN FT $ 10.16 96 $ 975.36 <br /> 2502.602 4"PVC PIPE DRAIN CLEANOUT EACH $ 371.00 2 $ 742.00 <br /> 2540.602 INSTALL GRILL EACH $ 570.00 1 $ 570.00 <br /> 2540.602 INSTALL HOT COAL BIN EACH $ 255.00 1 1 $ 255.00 <br /> BY OTHE RNISH AND INSTALL <br /> PURCH H $ 27, <br /> BY OTHERS ASE GRILL EACH $ 1,000.00 1 $ 1,000.00 <br /> BY OTHERS PURCHASE HOT COAL BIN EACH $ 500.00 1 $ 500.0 <br /> 00 <br /> TOTAL FLORAL PARK SHELTER COST $ 86,123.76 <br /> IF <br /> FLORAL PARK Contractor cost $ 56,659.76 <br /> City cost $ 1,500.00 <br /> -Playground vendor cost $ 27,964.00 <br /> TOTAL $ 86,123.76 <br /> Page 1 of 1 H RGreen <br />
The URL can be used to link to this page
Your browser does not support the video tag.