Laserfiche WebLink
OPINION OF PROBABLE PROJECT COST <br /> Arden Hills <br /> Park Improvements <br /> June 12,2023 <br /> Prepared by HR Green <br /> ITEM ITEM DESCRIPTION UNITS UNIT COST C.P.20-PARK-003 ESTIMATED <br /> NUMBER TOTAL COST <br /> ARDEN MANOR PARK-HARD COURT <br /> 2101.505 CLEARING ACRE $ 33,000.00 0.05 $ 1,650.00 <br /> 2104.503 REMOVE CHAIN LINK FENCE LIN FT $ 7.00 297 $ 2,079.00 <br /> 2104.504 REMOVE BITUMINOUS PAVEMENT SQ YD $ 2.51 864 $ 2,168.64 <br /> 2104.602 REMOVE BASKETBALL GOAL AND POST EACH $ 281.33 2 $ 562.66 <br /> 2106.507 COMMON EMBANKMENT CV CU YD $ 6.88 107 $ 736.16 <br /> 2106.507 EXCAVATION-COMMON CU YD $ 12.44 545 $ 6,775.69 <br /> 2106.507 SELECT GRANULAR EMBANKMENT CV CU YD $ 35.20 437 $ 15,382.40 <br /> 2108.504 GEOTEXTILE FABRIC TYPE 5 SO YD $ 3.52 516 $ 1,816.32 <br /> 2211.507 AGGREGATE BASE CV CLASS 5 CU YD $ 44.05 125 $ 8,061.15 <br /> 2360.509 TYPE SP 9.5 WEARING COURSE MIX(2,C) TON $ 138.60 87 $ 20,374.20 <br /> 2502.503 4"PE PIPE DRAIN LIN FT $ 24.72 36 $ 889.92 <br /> 2502.503 4"PERF PE PIPE DRAIN LIN FT $ 9.76 500 $ 4,875.12 <br /> 2502.602 4"PVC PIPE DRAIN CLEANOUT EACH $ 498.68 6 $ 2,992.08 <br /> 2521.603 5"THICK x 18"WIDE CONCRETE MAINTENANCE STRIP LIN FT $ 34.34 294 $ 10,095.96 <br /> 2540.602 INSTALL BASKETBALL GOAL AND POST EACH $ 1,445.00 2 $ 2,890.00 <br /> 2557.602 10'HIGH, 10'WIDE DOUBLE GATE EACH $ 1,425.00 1 $ 1,425.00 <br /> 2557.603 10'HIGH,3-RAIL CHAIN-LINK PERIMETER FENCE LIN FT $ 85.00 272 $ 23,120.00 <br /> 2557.603 4'HIGH,3-RAIL CHAIN-LINK PERIMETER FENCE LIN FT $ 140.00 10 $ 1,400.00 <br /> 2573.502 CULVERT END CONTROLS EACH $ 496.10 2 $ 992.20 <br /> 2574.508 SILT FENCE,TYPE MS LIN FT $ 3.85 502 $ 1,932.70 <br /> 2574.508 FERTILIZER TYPE 3 POUND $ 0.60 24 $ 14.40 <br /> 2575.508 HYDRAULIC MULCH MATRIX POUND $ 5.11 273 $ 1,395.03 <br /> 2575.508 SEED MIXTURE 25-131 POUND $ 139.19 29 $ 4,036.51 <br /> 2582.604 ACRYLIC COLOR SURFACING SO YD $ 14.46 515 $ 7,446.90 <br /> BY OTHERS PURCHASE BASKETBALL GOAL AND POST EACH $ 3,000.00 2 $ 6,000.00 <br /> TOTAL ARDEN MANOR PARK HARD COURT COST $ 129,112.04 <br /> ARDEN MANOR PARK Contractor cost $ 123,112.04 <br /> City cost $ 6,000.00 <br /> TOTAL $ 129,112.04 <br /> Page 1 of 1 H RG reen <br />