Laserfiche WebLink
OPINION OF PROBABLE PROJECT COST <br /> Arden Hills <br /> Park Improvements <br /> June 12,2023 <br /> Prepared by HR Green <br /> ITEM ITEM DESCRIPTION UNITS UNIT COST C.P.20-PARK-003 ESTIMATED <br /> NUMBER TOTAL COST <br /> ARDEN MANOR PARK-SHELTER <br /> 2104.502 REMOVE WOOD POST EACH $ 55.37 6 $ 332.22 <br /> 2104.504 REMOVE CONCRETE SLAB SO YD $ 5.53 72 $ 398.16 <br /> 2104.602 REMOVE SHELTER EACH $ 4,517.70 1 $ 4,517.70 <br /> 2106.507 COMMON EMBANKMENT(CV) CU YD $ 6.88 107 $ 736.16 <br /> 2106.507 EXCAVATION-COMMON CU YD $ 12.44 130 $ 1,613.09 <br /> 2106.507 SELECT GRANULAR EMBANKMENT(CV) CU YD $ 35.20 114 $ 4,012.80 <br /> 2108.504 GEOTEXTILE FABRIC TYPE 5 SO YD $ 3.52 86 $ 302.72 <br /> 2401.507 STRUCTURAL CONCRETE(3G52) CU YD $ 1,862.401 16 $ 29,789.40 <br /> 2401.508 REINFORCEMENT BARS EPDXY COATED LB $ 5.52 3200 $ 17,664.00 <br /> 2502.503 4"PE PIPE DRAIN LIN FT $ 24.72 25 $ 618.00 <br /> 2502.503 4"PERF PE PIPE DRAIN LIN FT $ 9.76 109 $ 1,063.84 <br /> 2502.602 4"PVC PIPE DRAIN CLEANOUT EACH $ 498.68 2 $ 997.36 <br /> 2540.602 INSTALL GRILL EACH $ 570.00 1 $ 570.00 <br /> 2540.602 INSTALL HOT COAL BIN EACH $ 255.00 1 $ 255.00 <br /> BY OTHER ND INST EACH $ 41.0 <br /> BY OTHERS PURCHASE GRILL EACH $ 1,000.00 1 $ 1,000.00 <br /> BY OTHERS PURCHASE HOT COAL BIN EACH $ 500.00 1 $ 500.00 <br /> TOTAL ARDEN MANOR PARK SHELTER COST $ 105,376.45 <br /> ARDEN MANOR PARK Contractor cost $ 62,870.45 <br /> City cost $ 1,500.00 <br /> Playground vendor cost $ 41,006.00 <br /> TOTAL $ 105,376.45 <br /> Page 1 of 1 H RG reen <br />