Laserfiche WebLink
Equipment & Building Replacement Fund <br />• The current plan includes replacing the City Hall roof in 2025 and replacing the City Hall air <br />handlers in 2028. <br />• PW staff has been working on the long-term asset replacement plan for equipment. Because <br />of this, $683,500 of new or replacement equipment was added to the plan through 2027 and <br />$174,000 was added for 2028. <br />• The current $50,000 tax levy does not support the needs of this fund. <br />Utility Funds <br />• Public Works staff continues to evaluate the condition of City utilities throughout the <br />community. The majority of street projects currently include a minimum amount for isolated <br />utility repairs but these amounts could increase as locations are identified where broader <br />water, sanitary sewer and drainage replacement is needed. <br />• For the Sewer Fund, no I&I grant funds have been included in the plan as the amounts are <br />unpredictable. <br />Rate increase assumptions are as follows: <br />■ Water — 2024-2033 (0%) — possibly look at rate reduction in a future year <br />■ Sewer — 2024-2026 (2%); 2027-2033 (0%) <br />■ Storm— 2024-2033 (1 %) <br />Council Direction <br />Staff is seeking direction from the City Council regarding the following items: <br />2024 projects <br />As we review the 2024 projects, does the Council have any questions, comments or concerns <br />about including them during budget preparation? <br />2024 property tax levy <br />The levies for the EDA ($100,000), Equipment/Building Replacement ($50,000), Public Safety <br />Capital ($220,000) and PIR ($250,000) are currently proposed to remain at the same amount as was <br />levied in 2023 in this plan. Levy increases are needed for the Equipment/Building Replacement <br />and Public Safety Capital funds. What increases, if any, should staff assume? <br />2023 General Fund transfer <br />There is $253,640 available to transfer from the General Fund to capital funds in 2023. This total <br />represents the amount at 12/31/2022 that was in excess of the 50% fund balance reserve goal <br />stated in the City's financial policies less the amount needed to be reserved due to additional costs <br />being incurred for the Communications Coordinator position and the NYFS contract. There are <br />some one time operational expenditures included in the 2024 Budget ($40,000 for ordinance <br />updates and $17,500 for a comp study). A portion of these funds could be used to cover those <br />costs so they are not included when calculating the needed levy increase. The 2023 Street <br />Maintenance budget will also need additional funds due to overages in the salt/sand and overtime <br />line items due to winter plowing. Does the Council have a preference on where the funds <br />should go? <br />2024 Local Government Aid (LGA) <br />The omnibus tax bill includes an $80 million annual increase in local government aid. Arden <br />Hills is not currently a recipient of LGA Funds. This increase would mean Arden Hills will <br />Page 3 of 4 <br />