My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
08-14-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 3:49:51 PM
Creation date
8/10/2023 3:46:49 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSENT ITEM — 8F <br />,-ARZEN HILLS <br />MEMORANDUM <br />DATE: August 14, 2023 <br />TO: Honorable Mayor and City Councilmembers <br />Dave Perrault, City Administrator <br />FROM: David Swearingen, P.E. Public Works Director / City Engineer <br />SUBJECT: Lift Station 5 Forcemain Rehabilitation Project — Professional Services <br />Agreement with Bolton & Menk, Inc. <br />Budgeted Amount: Actual Amount: Funding Source: <br />$435,000 (Forcemain) TBD Sanitary Sewer Utility Fund <br />$115,000 (Pumps and Valves) <br />Council Should Consider <br />Motions to approve, table, or deny the following: <br />• Professional Service Agreement with Bolton & Menk, Inc. in the amount not -to - <br />exceed of $121,084 for the Lift Station 5 Forcemain Rehabilitation Project. <br />Background <br />The Public Works Department maintains a program to refurbish and update sanitary sewer lift <br />stations on a cycle for reliability, technology and risk management. Public Works tracks data and <br />conducts testing and inspections to each of the 14 total wastewater lift stations around the City to <br />assist in determining future maintenance and rehabilitation needs. <br />Lift Station 5 has indicated a need to replace the existing forcemain, pumps and check valves. <br />This project is proposed for 2024 construction within the City's Capital Improvement Plan (CIP) <br />The existing forcemain is 3250-feet in length, is made of cast iron pipe (CIP) and was installed in <br />1960. The route of the existing forcemain is within an easement that is located within residential <br />properties, it extends under residential streets and borders the neighboring City of New Brighton. <br />Replacement of the existing forcemain will be by directional drilling new 10-inch PVC, 2400-ft <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.