Laserfiche WebLink
III. EXISTING CONDITIONS <br />A. Streets <br />The streets within the proposed project area are all local residential streets with urban street <br />sections consisting of bituminous pavement and B618 concrete curb and gutter. The <br />roadways provide a drive lane in each direction and parking along most, but not all, curb <br />lines. No parking is allowed along the eastern curb line of Royal Lane adjacent to Floral Park. <br />City records show the roadways were constructed primarily in the 1970's and 1980's with <br />varying levels of maintenance being completed since then. <br />Table 1 below shows the existing street widths from face of curb to face of curb, approximate <br />right-of-way widths, and the Overall Condition Index (OCI) of the pavements from a 2023 <br />City inspection. <br />Table <br />1 - Existing Streets <br />Street Name <br />Location <br />Street Width <br />ROW Width <br />2023 PCI Rating <br />Royal Lane <br />Norma Avenue to <br />34-ft <br />60-ft <br />45 <br />Floral Drive <br />Dawn Circle to <br />20 <br />Norma Avenue <br />34-ft <br />60-ft <br />Briarknoll Drive <br />Snelling Avenue N to <br />38 <br />Briarknoll Drive <br />34-ft <br />60-ft <br />Norma Avenue <br />Briarknoll <br />Briarknoll Drive east to <br />38 <br />34-ft <br />60-ft <br />Circle <br />cul-de-sac <br />Briarknoll Drive to <br />41 <br />Norma Avenue <br />34-ft <br />60-ft <br />Colleen Avenue <br />Indian Oaks Trail to <br />56 <br />James Avenue <br />32-ft <br />60-ft <br />Colleen Avenue <br />Snelling Avenue N to <br />35 <br />McClung Drive <br />34-ft <br />60-ft <br />Colleen Avenue <br />McClung Drive to <br />35 <br />Colleen Avenue <br />34-ft <br />60-ft <br />Hamline Avenue <br />Colleen Avenue south <br />40 <br />Colleen Circle <br />32-ft <br />60-ft <br />to cul-de-sac <br />Royal Hills <br />Snelling Avenue N to <br />32 <br />34-ft <br />60-ft <br />Drive <br />Arden View Drive <br />Arden Vista <br />Royal Hills Drive east to <br />38 <br />34-ft <br />60-ft <br />Court <br />cul-de-sac <br />Highway 96 W to the <br />41 <br />Keithson Drive <br />34-ft <br />60-ft <br />south —800 feet <br />The average OCI of the streets' pavements in the project area are generally below 50 with the <br />majority below 40. The bituminous pavement within the study area exhibits wear and distress <br />due to traffic loading as well as typical weathering effects experienced with aged asphalt <br />pavement. The existing pavement contains surface delamination, transverse cracking, <br />longitudinal cracking, some potholing, and some alligator -type cracking. Alligator cracking <br />in pavement is an indicator of potential subgrade problems. <br />Soil borings and a geotechnical evaluation were completed in the project area by Braun <br />Intertec and the report is included in Appendix E. The existing bituminous pavement <br />thickness ranges from 3.5 to 4 inches with an aggregate base thickness range from 6 to 7 <br />inches. Existing subgrade soils found beneath the aggregate base are predominantly loose to <br />medium dense sandy soils. <br />Prepared by: Bolton & Menk, Inc. EXISTING CONDITIONS <br />2024 PMP Street & Utility Improvements I OT1.130168 Page 2 <br />