My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
78-078
ArdenHills
>
Administration
>
City Council
>
Resolutions
>
1970-1979
>
1978
>
78-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:07:14 PM
Creation date
11/13/2006 2:45:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br /> <br />All persons present were then afforded opportunity to be <br /> <br />hear d. and the names ahd addresses of the persons appearing and <br /> <br />4It heard by the Council, and the substance of the views presented <br /> <br />by them were as follows: <br /> <br />MR. DON CHRISTOFFERSEN, city consulting engineer: This is <br />for proposed Improvement 78-3, Karth Lake Estates West. As <br />indicated on the screen - the boundaries of Karth Lake Estates West - <br />this is the southerly line, this is Amble Road in this vicinity, <br />and this is the extension of Nursery Hill Road as constructed today. <br />This is the north line of Karth Lake Estates West, and the south <br />line. The west line is here, and the east line is Karth Lake. <br /> <br />The streets proposed in this development extend from the <br />existing street at this point to a semi-cul-de-sac running <br />westerly to a cul-de-sac, and another street going southerly to <br />Amble Road. The street is proposed to be 34 feet in width, <br />designed for less than 400 vehicles per day, 7-ton load street, <br />will have bituminous surfacing and concrete curb and gutter. <br /> <br />The sanitary sewer proposed to serve the development would <br />be constructed (inaudible) a manhole on the westerly portion of <br />the cul-de-sac, running easterly to another manhole, and southerly <br />to the sanitary sewer. Also, a (inaudible) would be constructed <br />from a road here to intercept this sanitary sewer. Sanitary sewer <br />will serve the abutting lots. <br /> <br />The watermain proposed will connect to the existing water- <br />main at this point, follow generally on the north side of the <br />street, and terminate at this point. Another stretch of watermain <br />would loop the Nursery (inaudible) and connect to the Amble system <br />and connect at Amble Road. <br /> <br />. <br /> <br />Storm drainage improvements are as shown on the southerly portion <br />of the street generally, draining to a detention basin and outward <br />to an existing storm sewer and on to Karth Lake. You will note <br />that we have provided inlet points for the basins, or the swampy <br />areas to the south, as an assurance that the basins will not be <br />overflowed and flood the newly constructed property. It is not <br />the intent of these outlets to drain the ponding areas, but to keep <br />them at a normal level. Also, we have one constructed in this <br />position. Storm sewers are located in this position. (Inaudible) <br />and storm sewer running to this point and draining back to the <br />detention basin, and one from this point over, and also into the <br />detention basin, and then out into Karth Lake. ' <br /> <br />We find that this project is a feasible undertaking, and <br />recommend it be constructed as proposed. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.