My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-21-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
08-21-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 8:09:10 AM
Creation date
8/18/2023 8:07:49 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section <br />1.0 <br />1.0 PROJECT INFORMATION <br /> <br />BSI Project No.: WI 1545 <br />Customer: City of Arden Hills, MN <br />Customer P. O. Number: <br />Phone: 763-7927852 <br />Street/City/State/Zip: 1245 Hwy 96, Arden Hills, MN 55112 <br />Customer Contact: Jeff Frid <br />Tank Owner: City of Arden Hills Phone: Same as above <br />Client: Arden Hills Client Contact: Phone: <br />Owner's Tank Designation: South Tower <br />Tank Description: 1,000,000 Gallon Hydropillar <br />Tank Location (Street/City/State/Zip): 1230 Red Fox Road, Arden Hills, MN <br />Purpose of Inspection: Tank examination and interior and exterior coating evaluation <br />Date of Ins pection: 10-19-2022 <br />Inspected By: Kelly Mulhern NACE No 1692 & Logan Mulhern <br />Type of Ins pection: Float Down <br />Manufacturer: PDM <br />Serial No.: 56643 <br />Capacity: <br />Type of Construction: <br />Number and Size of Pilasters/Support Columns: <br />Tank D iameter: <br />Height: <br />Height to: <br />Construction Date: 1987 <br />Design Code: AWWA D-100 <br /> 1,000,000 Gallons <br /> Welded <br /> One fluted column <br /> 74 feet +/- <br />Overall 153’9”____Shell/Balcony N/A <br />HWL 139‘3”_____ LWL101’ <br />Type of Access to Tank Interior: Roof Manway <br />Tank Construction Drawings: None available <br />Previous Inspection Records: KCI 2012 <br /> <br />EXISTING COATING INFORMATION <br /> <br /> <br />Date Last Coated <br />Full or Spot Repair <br />INTERIOR WET <br /> 2013 <br /> Full <br />INTERIOR DRY <br /> 2013 <br /> Partial <br />EXTERIOR <br /> 2013 <br /> Full <br />Coating Contractor CPC CPC CPC <br />Surface Preparation <br />Paint System <br />Paint Manufacturer <br />Lab Lead Test Paint Chips <br /> SSPC-SP-10 <br /> Epoxy/Ep[oxy <br /> Tnemec <br /> No <br /> SSPC-SP-6 <br /> Epoxy/Epoxy <br /> Tnemec <br /> No <br /> SSPC-SP-6 <br /> Zinc/Epoxy/Urethane <br /> Tnemec <br /> No <br /> <br /> <br /> <br /> <br /> <br />PAGE 4
The URL can be used to link to this page
Your browser does not support the video tag.