My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-21-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
08-21-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 8:09:10 AM
Creation date
8/18/2023 8:07:49 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />3.4 Water <br />Stagnation and <br />De-Icing System <br />(SolarBeeGS-12) <br /> <br /> <br /> <br /> <br />3.5 Interior Dry <br />Structural <br /> <br /> <br /> <br /> <br /> <br /> <br />3.6 Interior Dry <br />Coating <br />3.4.1 <br />Currently the tower does not have a water stagnation system. BSI is suggesting <br />installing a Solar-Bee GS-12 unit, located on the bottom of the floor between the <br />drywell tube and the bowl plates. The Solar Bee unit will also aid in minimizing the <br />formation of ice inside the tower which can damage the coating system. See Solar- <br />Bee GS-12 Brochure. <br /> <br /> <br /> <br />3.5.1 <br />Install a safety climb cables on the interior of ladder from the catwalk to the bowl <br />manway ladder with a new DBI safety cable system. See DBI Brochure in Appendix B. <br />See photo 18. <br /> <br /> <br />3.6.1 <br />The coating Dry Film Thickness (DFT) on the interior dry surfaces is from 7.3 to 14.7 <br />mils with an a high of 12 plus mils DFT. <br /> <br />The coating on the interior dry was replaced in 2013 and is now 10 years old and it is <br />considered repairable based upon its age. <br />BSI is recommending spot repairing the following areas: <br />The complete drywell tube <br />The complete top side of the steel condensate ceiling (estimated 100 random spots on <br />the fluted column and ladders) <br /> <br />The complete interior dry surfaces should be spot reconditioned at the same time the <br />tower is next scheduled for reconditioning in the next five (5) years. See photos 15 <br />thru 22. <br /> <br />The coating on surfaces subject to sweating (interior of drywell tube, exterior of bowl <br />and condensation ceiling top side) should be replaced at the same time the tower is <br />next scheduled for reconditioning in the next five (5) years. <br /> <br /> <br /> <br /> <br /> <br />3.7 Exterior Structural 3.7.1 <br /> <br /> <br />Replace the existing obstruction light with a new style LED obstruction light, bracket, <br />photo-cell and electrical conduit. The new obstruction light should higher than the <br />tallest Telecommunication Antenna, approximately 10-feet above the roof. See H&P <br />Drawing, BSI Drawing 27 and photo 23. <br /> <br /> <br /> <br /> <br /> <br />8
The URL can be used to link to this page
Your browser does not support the video tag.