Laserfiche WebLink
implementation of stormwater management projects in the RCWD. The funding is intended for <br />projects that provide stormwater quality treatment, runoff volume reductions, peak runoff rate <br />control and/or reductions in groundwater usage. Projects proposed in conjunction with municipal <br />street projects, such as this one, are encouraged. Applications for the 2024 Stormwater <br />Management Grant are expected to open around the end of September and be due around mid - <br />December. The grant application to the RCWD and grant administration should be considered for <br />addition to delivery of this project. <br />While the City standard process includes an estimated percentage -based method of estimating overhead <br />and contingencies that was included in the feasibility report's project costs, the actual estimated additional <br />trail design, wetland permitting, and grant application fees for the potential scope additions are $23,000. <br />If the above identified additional project scope is directed by Council to move forward with the final <br />design phase of the project, these additional fees will encompass the necessary additional final design and <br />plan production efforts. <br />The original proposal for the project was in the total amount of $318,756, with the final design tasks being <br />$83,312. The potential project scope additions described above would result in an increase to the overall <br />fees that encompasses the scope of work approved for on these tasks. We are requesting an amendment for <br />$23,000, if the additional project scope is approved. This would bring the total project fee to $341,756 with <br />the final design tasks totaling $106,312. <br />TOTAL PROJECT AMENDMENT FEE = $23,000 <br />We appreciate your trust in us to complete these potential project changes that have been identified over <br />the course of the project process to date. We look forward to the final design phase of this project and <br />generating construction documents to bring the final project concept to life for the City of Arden Hills. <br />Sincerely, <br />BOLTON & MENK, INC. <br />&Ju,/t/ AL�_z <br />Brad Fisher, P.E. <br />Principal Engineer <br />This document shall serve as an amendment to the Agreement for Professional Services between the parties, <br />dated April 10, 2023 (the "Contract"), pursuant to Section 3.A.1 thereof. All other provisions of the Contract <br />shall remain in full force and effect except as herein modified. <br />Accepted: <br />City of Arden Hills <br />cc: Mike Waltman, P.E., Principal Engineer <br />H:\ARDH\0T1130168\0_2024 PMP Street & Utility Improvements\A_Project Management\2_Contracts\Amendments\Amendment 1\130168_2024 PMP Street & Utility <br />Improvements Amendment 1_20230814.docx <br />Balton & Menk is an eouaL 0000rtunity emokover. <br />