My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-28-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
08-28-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2023 3:57:10 PM
Creation date
8/24/2023 4:04:20 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. David Swearingen I Arden Hills <br />South Tower Improvements Project PW-23-0107 <br />August 23, 2023 <br />Page 2 <br />vi. Intrusion alarms for overhead doors at booster station and water tower. <br />vii. Locking mechanism for interior ladder. <br />4. Incorporate comments from the CITY and prepare 90% plans and specifications. <br />5. Incorporate comments from the CITY and prepare Issued for Bid Plans and Specifications. <br />6. This proposal assumes preparation of three (3) Civil plan sheets, two (2) structural plan sheets, and two <br />(2) electrical plan sheets. <br />D. Bidding Assistance <br />1. Upload bidding documents to QuestCDN. <br />2. Respond to bidder questions, and issue addendums as needed. <br />3. Attend bid opening tabulation of bids and prepare an award recommendation letter. <br />4. Assist with grant applications and manage to fulfillment. <br />E. Construction Administration <br />1. Lead pre -construction meeting and prepare minutes. <br />2. Shop drawing review. <br />3. Prepare monthly payment applications. <br />4. Respond to requests for information (RFIs). <br />5. Complete three (3) site visits to review construction progress. <br />6. Preparation of final punch list. <br />7. Preparation of final payment with close out documentation. <br />III. ADDITIONAL SERVICES <br />If authorized in writing by the CITY, we will furnish or obtain from others Additional Services of the types listed below <br />which are not considered as basic services under this Proposal. Additional Services shall be billable on an Hourly <br />Time and Materials basis and such billings shall be over and above any maximum amounts set forth in this Proposal. <br />A. Right-of-way or easement acquisition. <br />B. Wetland delineation. <br />C. Construction inspection. <br />D. Construction staking. <br />IV. CITY'S RESPONSIBILITIES <br />These responsibilities shall be as set forth in Article 8 of the General Provisions and as further described or clarified <br />hereinbelow: <br />A. Designate one individual to act as a representative with respect to the work to be performed, and such person <br />shall have complete authority to transmit instructions, receive information, interpret and define policies, and <br />make decisions with respect to critical elements pertinent to the Project. This individual shall be identified in the <br />signature block area of this Proposal. <br />B. Provide TKDA with access to the site as required to perform services listed in SECTION II. <br />C. Provide reviews of materials furnished by TKDA in a reasonable and prompt manner so the Project schedule <br />can be maintained. <br />D. Provide as -built drawings for South Tower and booster station. <br />V. PERIOD OF SERVICE <br />We would expect to start our services promptly upon receipt of your written acceptance of this Proposal and to <br />complete SECTION II services according to the preliminary schedule detailed below. Final dates for Construction <br />Administration will be set by the contractor and are therefore out of TKDA's control. The schedule for this phase of <br />service is provided for the convenience of the CITY and is subject to change. <br />• Project Initiation - September 2023 <br />• Design — September 2023 through January 2024 <br />rmi <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.